仰板焊接工艺指导书(Guide book of welding process of inverted plate).docVIP

  • 8
  • 0
  • 约8.86千字
  • 约 8页
  • 2017-08-03 发布于河南
  • 举报

仰板焊接工艺指导书(Guide book of welding process of inverted plate).doc

仰板焊接工艺指导书(Guide book of welding process of inverted plate) Weld preparation 1. Preparation of groove: mechanical groove, groove Angle Degrees of 35 °. 2, specimen cleaning: the former counterpart parent metal should be 20 ㎜ range from groove inside and outside surface clean up oil, dirt, rust, etc, And exposed the metallic luster. 3, specimen counterpart: end clearance for 3 ~ 3.5 ㎜, blunt edge 2-3 ㎜, solid welding points to two points, located at both ends, the length of 10 to 15 ㎜, predeformation 2 °, and two level. Operating essentials 1, base: in the first groove welds of the arc, and then

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档