锚杆静压桩加固桥梁桩基简介(An introduction to the pile foundation of the bridge).docVIP

锚杆静压桩加固桥梁桩基简介(An introduction to the pile foundation of the bridge).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
锚杆静压桩加固桥梁桩基简介(An introduction to the pile foundation of the bridge) An introduction to the pile foundation of the bridge Yang dalin li xiaoming (fujian zhanglong highway J resident office of zhangzhou 363,000) Abstract: the bridge to be completed and opened to traffic is completed. The pile bearing capacity of pile bearing capacity is insufficient to cause the piers to sink, and the static pile of bolt is added Solid bridge pile foundation is an effective treatment method. This paper introduces the static pile of the viaduct in zhanglong highway book hall in fujian province The construction of pile foundation is reinforced for reference of pile foundation of similar bridge. Key words: bridge engineering; Reinforcement of pile foundation; Static pile of anchor rod; Processing method 0 foreword The total length of the viaduct of the zhanglong expressway in fujian province is 1518.5 m, and the bridge is wide: 11.75 x 2 x 0.5 m, single hole span: L = 25m. Pile foundation, double column pier, and T beam quasi-continuous superstructure. In the construction of the girder, it is found that the pile of the pillar of the local bridge pier of T beam has the tendency of subsidence. By the static load test results show that friction pile bearing capacity is insufficient, in the vast majority of column pier has been completed under certain conditions, USES the anchor jacked pile reinforcement technology, increase the bearing capacity of pile foundation, meet the design requirements. Comparison and selection of foundation pile reinforcement scheme 1.1 foundation pile design Double column type pier foundation pile, friction pile design, pile diameter 1.5 m, pile length 34 ~ 41 m, through the deep and shallow silt residual sand clayey soil, part of the pile embedded strongly weathered rock, design single pile vertical load of 4200 kn. 1.2 static load test for base piles Found in frame beam in the construction of pier foundation sinking, drilled pile is complete right now, most of th

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档