4机电工程管理与实务选择题(4. Mechanical and electrical engineering management and practice selection).doc

4机电工程管理与实务选择题(4. Mechanical and electrical engineering management and practice selection).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
4机电工程管理与实务选择题(4. Mechanical and electrical engineering management and practice selection) 1. The pipe diameter of the hydrant fire extinguishing system is less than or equal to (). A, 80 mm B, 100 mm C, 125 mm D, 150 mm 2. The function of generator excitation winding is to pass in (). A, dc excited current, generate constant magnetic field B, exchange excitation current, produce the main magnetic pole magnetic field C, dc excited current, generate the geomagnetic pole magnetic field D, ac excitation current, generate rotation magnetic field 3. Single-phase transformer is more than equivalent capacity three-phase transformer (). A. Stable operation B, save manufacturing materials C, small volume D. Large volume To conduct the weld of partial radiographic examination or ultrasonic examination, the test position shall be specified by (). A, the supervisor B, nondestructive testing personnel C. Quality inspection personnel D. welding personnel 5. To test the mechanical properties and bending properties of the welded joint of pressure vessel products, the welding test plate shall be made (). A, flat weld Vertical weld C, ring weld D, longitudinal weld B C D D D D1, the water supply pipe diameter of hydrant fire extinguishing system is less than or equal to (). A, 80 mm B, 100 mm C, 125 mm D, 150 mm 2. The function of generator excitation winding is to pass in (). A, dc excited current, generate constant magnetic field B, ac excitation current, the main magnetic field C, dc excited current, generate the geomagnetic pole magnetic field D, exchange excitation current, produce rotating magnetic field 3. Single-phase transformer is more than equivalent capacity three-phase transformer (). A. Stable operation B. Save manufacturing materials C, small volume D. Large volume 4. Weld seams for local radiographic inspection or ultrasonic testing shall be specified by (). A, supervisor B, nondestructive testing personnel C. Quality inspection personnel D. welding personnel 5. To tes

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档