高速铁路维修养护及其设备概述(Maintenance and maintenance of high speed railway and its equipment overview).doc

高速铁路维修养护及其设备概述(Maintenance and maintenance of high speed railway and its equipment overview).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
高速铁路维修养护及其设备概述(Maintenance and maintenance of high speed railway and its equipment overview) The analysis and comparison of the construction process and the technical economy of the seamless line of the shallow speaker rail exchange and the single-pillow continuous method High-speed rail seamless line, in fully meet for railway passenger transport fast, safe, comfortable, convenient and reliable demand on time and at the same time, also greatly improve the competition ability of the railway, is a technical decision of railway development in our country, also accord with the trend of the worlds railway development. Following an overall acceleration of seamless construction technology are also gradually improve, seamless track laying methods mainly include single pillow laying seamless line continuation method (hereinafter referred to as single pillow continuous law) and in the long rail laying seamless line method (hereinafter referred to as the shop in law), the article will combine existing lines to build two construction methods in the second line in making some analysis and construction technology and technical and economic comparison. 1. Main features of long rail laying 1.1 the main characteristics of long rail are laid by changing the laying method (1) the main construction technology of the replacement method Use tools to track assembled at PuJia base 25 m rail section, engineering train section rail transport to the site of track-laying engineering line, the use of track-laying machine laying 25 m rail section, when laying tool rail reaches a list of long rail length of conductor rail, rail transporter will factory welding long rail unloading to the new line of ballastless shoulder on both sides, the scene using aluminium heat welding will be 500 m long rail rail welding into 1500 m units, machine to raise standards after the track detection, ballast bed resistance standard, after the lock on the rail temperature when the demolition of the new shop section l

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档