脚手架1(Scaffolding 1).docVIP

  1. 1、本文档共27页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
脚手架1(Scaffolding 1) Multi-storey residential projects in the first phase of the century The work of the footman Knitting system: The reviewer: Security audit: Umpire: Qidong yinzhou building installation engineering co. LTD In June 2006, Orders to record I. project overview Ii. Project characteristics and environmental characteristics 3. Preparation of the basis 4. Construction technology of foot hand engineering 5. Safety technology of foot hand construction A multi-storey residential project in the first phase of the century I. project overview The first phase of silver chau century home is made up of 14 5F + 1 brick residential buildings. The construction area and structure level of each unit project are shown in the following table (1). The construction unit of the project is nantong silver continent real estate development co., LTD., designed by qidong architectural design institute co., LTD., nantong rita supervision company, from the association of supervision, qidong ngan chau construction general contracting construction installation engineering co., LTD. Ii. Project characteristics and environmental characteristics This project is a masonry structure with masonry scaffolding, interior decoration scaffold, support (load) scaffolding, etc. The scaffolding and the scaffolding of the scaffold are located. In this project, we use the holder of the steel pipe, and according to the regulations, we require that the use of bamboo scaffolding shall be strictly prohibited and the scaffold shall not be suspended. The construction part of this project is mainly in the 5F + 1 layer, and the relative height is not too high. The temporary walls in the construction area have been built. The roadbed of the construction road is completed; The road drainage network has been connected to the municipal network; The construction site is equipped with water and electricity. To the south of the district is the road of wei, the north is south park road, the east side is the temple

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档