照价易忘记的100项(100 items that are easy to forget).docVIP

照价易忘记的100项(100 items that are easy to forget).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
照价易忘记的100项(100 items that are easy to forget) 1. Drain holes in the insulation roof of the flat roof Embedded iron in stair railing 3 scaffolds for paint and paint construction Precast slab concrete: concrete, transportation and installation of plate beam sealing 5 bored piles: drilled into the depth of the rock (the project includes a large gap between the municipal and highway quota projects) 6 indoor piping installation is easy to miss Ultra high cost for outdoor piping installation The installation of Angle steel and the cost of its main materials It is easy to miss the coefficient of the soil on the single side of the ditch The artificial coefficients of the outer soil are forgotten 11 cable, wire, etc. List is only to provide net engineering quantity, in group price also must add reservation, bending, loss and so on length 12. The basic shape steel is easy to leak in the distribution cabinet installation list The casing in the pipe installation list is easy to leak The duct is blocked by the wall Adjust the pressure test to flush the temporary control for installation. 16. Equipment installation equipment amortization. 17. The flange mounting bolts in the process pipeline are unpriced materials. 18. Installation part: the base of the increase fee of the high-rise building includes the total labor cost of 6 floors or less than 20m. When the high-rise buildings are in accord with the high construction conditions, the increase of the higher construction fee and the high increase fee are superimposed. 19. Roof line and cover plate! Mostly scattered parts! 20. Some scattered and small components are easy to leak; 21. There are gaps in the roof, especially in the heat insulation layer. The cement mortar has a split seam in the horizontal layer, and the seam is also divided on the insulation board. 22. It is also easy to miss the requirements of some specifications, such as: when the wall is longer than 5 meters, the construction column should be added, and the press

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档