网站大量收购独家精品文档,联系QQ:2885784924

工程测量管理制度(Engineering measurement management system).doc

工程测量管理制度(Engineering measurement management system).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程测量管理制度(Engineering measurement management system) Engineering measurement management system XX company in accordance with the management of construction technology standard requirement, build system of this project intends to measure management, specify the full-time measurement engineering and technical personnel, in strict accordance with the requirements to do a good job of engineering survey. 1.1 transfer pile work 1.1.1 engineering bid, the project intends to chief engineer of the organization, the superior department in charge of technical measurement engineers and project related personnel to participate in, intends to take the initiative to contact the construction units, design units in a timely manner the handover. 1.1.2 when the handover is made, the site shall be handed over and checked at the site of the pile in the written material of the handover document, and shall make a clear identification on the spot to find out. 1.1.3 when the handover is recognized, the written material must be truthful and complete; The record of the transfer pile shall be written in clear of the existing problems and processing opinions and reported to the superior units and construction units. 1.1.4 determine the boundary of the project scope (including temporary works) according to the requirements of the construction unit and participate in the land expropriation and demolition work. 1.2 construction survey The construction measures are divided into four stages: construction retest, control network measurement, construction lofting, inspection and completion measurement. During the strict construction process, the management of the measurement shall be carried out in the construction of the handoff piles, piles and piles, and the periodic retest shall be carried out, and the construction measurement and the lofting shall be carried out in double inspection. To control engineering construction survey process, ensure the building space and the accuracy of geometry size, th

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档