工程形象(The engineering image) Iii. Project image progress 1. Completion of the current project schedule: The schedule of the current schedule is the monthly progress plan of the phase ii expansion project of the company Compare the benchmark with the actual progress. The comparison results are shown in the table below Project completion planning degree (%) Civil engineering The main plant 13 meter column concrete pouring part complete 25 % 2. The concrete pouring of 10.98 meters of floor beams of the main plant is not 0 % 3. The bottom plate of coal pit is poured 100% The masonry section of the chimney shall be 80 % 5. The excavation and bedding of the clay excavation are 60% The foundation of coal wall foundation excavation is 40% completed The installation 1. The installation of the air preheater connected to the furnace is 100% 2. The installation and completion of the import and export frame of the cyclone tube is 100% 3. The boiler group of the furnace is 90% of the installation part The water test part of the furnace is 90% 2. The analysis and measures taken for the completion of the situation, as well as the views planned for next month: The problem of construction progress is still the main contradiction of this project. The owner proposed the three unshakable namely the determination to realize heating for the year of November 30 this year. The determination to generate electricity in the first quarter of next year will not be shaken; Carry out the heating contract with the customer. All work should be carried out around this central goal. However, the current monthly schedule provided by the company is not satisfied with the overall target of the trial run on November 30. There are three main reasons for not completing this months plan In the autumn harvest season, construction manpower shortage. (2) without consent of the manufacturer, installation unit without authorization before the main steam valve of the boiler body with an elbow, manufacturers to incr

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档