- 1、本文档共18页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
家装工艺 常识篇(Common sense of home decoration process)
The first: work that needs to be done before commencement of work
1. To beat the ground of the wall, whether the air drum is empty, such as the empty drum requires the developer to remove the redo;
2. The kitchen, bathroom, balcony and patio are closed water experiments, such as water leakage to urge the developer to rectification;
3. Connect the cold hot water pipe, open the total valve and open the block one by one to see if it is all water;
4. Protect all finished products (such as security door, visual telephone doorbell, finished kitchen, gas meter, etc.);
5. Carefully check whether the strong and weak circuit is smooth, whether the floor is leaking or the water is flowing smoothly;
6. Carefully check whether the wall column is skewed and so on.
The second: transform the wall craft
1. Use the cutter to remove the hidden contents of this post
Do not use sledgehammer, so as not to disturb the wall that is not removed.
2. First use a small hammer drill to empty the bottom surface and slowly upward. The new hole door is to be added;
3. Non-hitting parts: load-bearing wall, concrete wall.
The third: water making process
1. In the depth of the wall, the distance between the pipe wall and the wall shall be 1CM, strictly following the principle of left hot right cold;
2. The outlet must be arranged in strict accordance with the national standard faucet spacing.
3. No blockage inside, connect the pressure pump of cold and hot water pipe to pressure 0.8mpa. Unsealing wall without pressure test;
4. After the tile tiling, the silk elbow in the cold and hot water should not be highlighted.
5. After the water pressure test, open the main valve and open the block one by one to see if the joint is blocked;
6. Draw the accurate water pipe line map to the owner to save (best to be able to take photos in the construction section).
The fourth: electrotechnics
1, four square loop separately packaged chiller air conditioning go, kitc
您可能关注的文档
- 巴氏奶与普通奶的区别(The difference between buttermilk and regular milk).doc
- 巴勒斯坦旅游旅行攻略(Travel guide to Palestine).doc
- 帮你认字(To help you read).doc
- 巴西ncm 号码(Brazil NCM number).doc
- 帮助我们祛湿的食物(Help us eat clearing damp).doc
- 布法罗旅游指南 (buffalo guide) - 纽约州出境游指南 yododo 游多多(Buffalo guide - New York state travel guide yododo Tours).doc
- 布料机在水泥混凝土路面摊铺施工中的应用_石磊(Application of cloth machine in cement concrete pavement paving construction).doc
- 布料基本知识(Fabric basics).doc
- 布鲁氏菌病防治技术规范(Technical specification for brucellosis).doc
- 布什在林肯号航空母舰上的讲话(Bush's speech on the uss Abraham Lincoln).doc
最近下载
- 2023年苏州卫生职业技术学院单招职业适应性测试模拟试题及答案解析.docx VIP
- 大疆 DJI Matrice 4 系列 - 用户手册 v1.0.pdf
- 2025年北京海淀区九年级中考二模英语试卷试题(含答案详解).pdf VIP
- 供应商评审表(代理商及贸易商类-现场评审).pdf VIP
- 2024年苏州卫生职业技术学院单招职业适应性测试模拟试题及答案解析.docx VIP
- 2023年陕西省初中学业水平考试生物、地理试卷含答案.docx
- 11BS3 给水工程(华北标图集).docx
- 2025年苏州卫生职业技术学院单招综合素质考试模拟试题及答案解析.docx VIP
- 2025年苏州卫生职业技术学院单招职业适应性测试模拟试题及答案解析.docx VIP
- HGT 4120-2024《工业氢氧化钙》.pdf
文档评论(0)