市政验收专家判断题汇总(Municipal acceptance experts judge the summary) 3. Judgment (30 questions, 1 point per question) 1. The hoisting rings of precast members must be made of uncooled HRB335 hot rolled steel bars and shall not be replaced by other steel bars. (x) 2. The finished products, semi-finished products and components shall be sampled according to the regulations before use, and the testing institution shall conduct the second test. The test results are qualified before use. (x) 3. The water permeable soil slope should not be covered by the soil with high water permeability. (x) 4. The strength of concrete shall meet the design requirements when the prestressed tensioning is drawn, and shall not be less than 70% of the design strength when the design is not required. (x) 5. The deflection value of hot mix asphalt mixture should not be greater than the design rule, check the quantity: every lane, every 30 meters, measure 1 point. (x) 6. When the backfilling time of the winter period is more than 500mm, the amount of frozen soil can be added uniformly, the quantity shall not exceed 30% of the total volume of the fill, and the size of the frozen block shall not exceed 100mm. (x) 7. The distance from the bending point to the interface shall not be less than the diameter of the pipe and shall not be less than 100mm. (fx) 8. The raw materials, semi-finished products and finished products used in the water supply and drainage pipelines shall meet the relevant hygienic requirements. (fx) 9. When the water supply and drainage pipeline is laid in the rain, measures should be taken to prevent the pipe from floating. (fx) 10. After the full water test of the digester is qualified, the air tightness test should be conducted. (fx) 11. The deformation rate of steel tube or ductile iron pipe should be no more than 3%, and the deformation rate of the chemical material pipe should not exceed 2%. (x) 12. When water treatment structures are located below the underground water level, the

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档