- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
屋面tdf防水施工方案(Roof TDF waterproof construction scheme)
Page 1 of 9
A, compiled on the basis of 1, southeast university architecture design and research institute co., LTD. Provide construction design blueprint
The design blueprint of the civil defense works provided by the limited company.
2, TDF waterproof thermal insulation material, building structure 11 cj29 2, project summary Ents of the affiliated high school of nanjing normal university school district is located in nanjing xiaguan districts sancha river base on the east side for the new plan
The urban road south area to the west side of Yangtze river avenue for Yangtze river north square near the crossing victory. The building is always on the ground
The product is about 51830.92 square meters. This project as a 20 gauge three-year junior high school students about 1600 people. School by
Information office complex building, gymnasium, teaching building, laboratory building, dormitory building. The total construction area is 60126.17
Square meters the ground construction area of 38213.95 square meters underground construction area of 21912.22 square meters.
All parts of the project construction through a layer of big platform connecting to form a whole. Information office complex building, teaching
School buildings, laboratory buildings and dormitories the floor of the ground floor of a six-story stadium underground local underground on the second floor two on the ground
Layer local three-layer 400 meters track and field overall raise a layer lower local lived for student canteen, garage, and sports
Use room, etc. Construction preparation
a organization for 1, establish a project manager is responsible for total quality, security guarantee mechanism tube was carried out on the roof waterproof engineering construction
Richard.
2, quality inspector is responsible for supervise to carry out the roof waterproof project quality goal track inspection control engineering
Qu
您可能关注的文档
- 巴氏奶与普通奶的区别(The difference between buttermilk and regular milk).doc
- 巴勒斯坦旅游旅行攻略(Travel guide to Palestine).doc
- 帮你认字(To help you read).doc
- 巴西ncm 号码(Brazil NCM number).doc
- 帮助我们祛湿的食物(Help us eat clearing damp).doc
- 布法罗旅游指南 (buffalo guide) - 纽约州出境游指南 yododo 游多多(Buffalo guide - New York state travel guide yododo Tours).doc
- 布料机在水泥混凝土路面摊铺施工中的应用_石磊(Application of cloth machine in cement concrete pavement paving construction).doc
- 布料基本知识(Fabric basics).doc
- 布鲁氏菌病防治技术规范(Technical specification for brucellosis).doc
- 布什在林肯号航空母舰上的讲话(Bush's speech on the uss Abraham Lincoln).doc
文档评论(0)