网站大量收购独家精品文档,联系QQ:2885784924

屋面tdf防水施工方案(Roof TDF waterproof construction scheme).doc

屋面tdf防水施工方案(Roof TDF waterproof construction scheme).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
屋面tdf防水施工方案(Roof TDF waterproof construction scheme) Page 1 of 9 A, compiled on the basis of 1, southeast university architecture design and research institute co., LTD. Provide construction design blueprint The design blueprint of the civil defense works provided by the limited company. 2, TDF waterproof thermal insulation material, building structure  11 cj29  2, project summary Ents of the affiliated high school of nanjing normal university school district is located in nanjing xiaguan districts sancha river  base on the east side for the new plan The urban road south area to the west side of Yangtze river avenue    for Yangtze river north square near the crossing victory. The building is always on the ground The product is about 51830.92 square meters. This project as a 20 gauge  three-year junior high school students about 1600 people. School by Information office complex building, gymnasium, teaching building, laboratory building, dormitory building. The total construction area is 60126.17 Square meters  the ground construction area of 38213.95 square meters  underground construction area of 21912.22 square meters. All parts of the project construction through a layer of big platform connecting  to form a whole. Information office complex building, teaching School buildings, laboratory buildings and dormitories  the floor of the ground floor of a six-story  stadium underground local underground   on the second floor two on the ground Layer  local three-layer  400 meters track and field overall raise a layer  lower local lived for student canteen, garage, and sports Use room, etc. Construction preparation  a  organization for 1, establish a project manager is responsible for total quality, security guarantee mechanism  tube was carried out on the roof waterproof engineering construction Richard. 2, quality inspector is responsible for supervise  to carry out the roof waterproof project quality goal  track inspection control engineering Qu

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档