宿迁市住宅工程质量通病防治刚性措施(Preventing and controlling the quality of residential project in suqian city).docVIP

宿迁市住宅工程质量通病防治刚性措施(Preventing and controlling the quality of residential project in suqian city).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
宿迁市住宅工程质量通病防治刚性措施(Preventing and controlling the quality of residential project in suqian city) Preventing and controlling the quality of residential project in suqian city In order to improve the quality of the housing project, to overcome the quality of the residential project and to regulate the prevention and control of the quality of residential projects. In the newly built within the administrative jurisdiction of this municipality, rebuilding and expansion of residential project, in the process of design, construction, construction, in addition to implement relevant state laws, regulations and engineering technical standards and other specified, shall also the execution measures. I. technical measures for the prevention and control of wall cracks (1) design 1, residential engineering foundation should be in accordance with the deformation control design, and according to the relevant provisions of the specification for design of building foundation deformation calculation, using natural and the average residential engineering settlement calculation of composite foundation is not more than 50 ㎜. 2. When the length of the residence is greater than 45M, the deformation seam should be set. When other reliable measures are available, it may be properly relaxed within the standard scope. 3, top and bottom of masonry engineering should be set full cast-in-place reinforced concrete beam window, height should not be less than 120 ㎜, longitudinal reinforcement is not less than 10, 4 Φ stirrup Φ 6 @ 200, other layers in the window sill elevation should be set on cast-in-place reinforced concrete plate with long, on both ends of the top masonry houses along the height direction should be set interval of not more than 1.3 M of cast-in-place reinforced concrete plate, plate with strength grade of concrete should not be less than C20, longitudinal reinforcement should not be less than 3 Φ 8. 4, small hollow concrete masonry, autoclaved aerated concrete block such as light w

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档