网站大量收购独家精品文档,联系QQ:2885784924

安规试题(Safety tests).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安规试题(Safety tests) 1. Fill in the blanks: (1.5 points per blank, 30 points) 1. The equipment is divided into two types: high voltage and low voltage: the voltage of the device to the earth is high and the voltage of the device is high, and the voltage of the device is low to 1000V and below. 2. In case of any doubt in operation, the operation should be stopped immediately and reported to the duty dispatcher or the duty officer, and then the operation shall be carried out after knowing the problem. Do not change the operation ticket without authorization, and do not remove the locking device at will. 3. One of the two working tickets must always be kept in the work place, received by the person in charge of the work, and the other shall be received by the job licensor and shall be transferred by value. 4. After all the work, the work class should be cleaned and organized. Working controller should be carefully check, after being evacuated all the staff work, to the personnel on duty clear repaired project, found the problem, test results and existing problems, etc., and check the equipment status, with the attendant presence of legacy objects, cleanliness, etc., and then fill in the working ticket Ming work end time, after examined and signed by both parties, working ticket party came to an end. 5. When the electrical equipment catches fire, the power supply of the equipment should be cut off immediately and then the fire can be saved. Should use dry fire extinguishers, carbon dioxide fire extinguishers and other fire extinguishers for electric equipment, not to use foam fire extinguishers. 6. Wells, pits, holes or channels in and outside the production plant must be covered with a solid flat plate with the floor flush. If you need to remove the cover in the repair work, you shall set up a temporary fence, temporary punch hole, hole, and after the construction is finished, you must restore the original form. 7. All lift ports, large holes, hole staircases and platfor

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档