安规试题(Safety tests)
1. Fill in the blanks: (1.5 points per blank, 30 points)
1. The equipment is divided into two types: high voltage and low voltage: the voltage of the device to the earth is high and the voltage of the device is high, and the voltage of the device is low to 1000V and below.
2. In case of any doubt in operation, the operation should be stopped immediately and reported to the duty dispatcher or the duty officer, and then the operation shall be carried out after knowing the problem. Do not change the operation ticket without authorization, and do not remove the locking device at will.
3. One of the two working tickets must always be kept in the work place, received by the person in charge of the work, and the other shall be received by the job licensor and shall be transferred by value.
4. After all the work, the work class should be cleaned and organized. Working controller should be carefully check, after being evacuated all the staff work, to the personnel on duty clear repaired project, found the problem, test results and existing problems, etc., and check the equipment status, with the attendant presence of legacy objects, cleanliness, etc., and then fill in the working ticket Ming work end time, after examined and signed by both parties, working ticket party came to an end.
5. When the electrical equipment catches fire, the power supply of the equipment should be cut off immediately and then the fire can be saved. Should use dry fire extinguishers, carbon dioxide fire extinguishers and other fire extinguishers for electric equipment, not to use foam fire extinguishers.
6. Wells, pits, holes or channels in and outside the production plant must be covered with a solid flat plate with the floor flush. If you need to remove the cover in the repair work, you shall set up a temporary fence, temporary punch hole, hole, and after the construction is finished, you must restore the original form.
7. All lift ports, large holes, hole staircases and platfor
您可能关注的文档
- 巴氏奶与普通奶的区别(The difference between buttermilk and regular milk).doc
- 巴勒斯坦旅游旅行攻略(Travel guide to Palestine).doc
- 帮你认字(To help you read).doc
- 巴西ncm 号码(Brazil NCM number).doc
- 帮助我们祛湿的食物(Help us eat clearing damp).doc
- 布法罗旅游指南 (buffalo guide) - 纽约州出境游指南 yododo 游多多(Buffalo guide - New York state travel guide yododo Tours).doc
- 布料机在水泥混凝土路面摊铺施工中的应用_石磊(Application of cloth machine in cement concrete pavement paving construction).doc
- 布料基本知识(Fabric basics).doc
- 布鲁氏菌病防治技术规范(Technical specification for brucellosis).doc
- 布什在林肯号航空母舰上的讲话(Bush's speech on the uss Abraham Lincoln).doc
- 中国标准负载装料口行业市场占有率及投资前景预测分析报告.pdf
- 中国石油钻机井架行业市场占有率及投资前景预测分析报告.pdf
- 2024年遂宁职业学院招聘笔试真题及答案详解一套.docx
- 2024开封职业学院招聘笔试真题及参考答案详解.docx
- 2024惠州卫生职业技术学院招聘笔试真题及参考答案详解一套.docx
- 2024年浙江东方职业技术学院招聘笔试真题带答案详解.docx
- 2024年益阳职业技术学院招聘笔试真题及完整答案详解1套.docx
- 2024年浙江宇翔职业技术学院招聘笔试真题及答案详解一套.docx
- 2024年重庆文化艺术职业学院招聘笔试真题带答案详解.docx
- 2024年石河子工程职业技术学院招聘笔试真题及答案详解1套.docx
最近下载
- 四川省(蓉城名校联盟)新高考2022级高三适应性考试数学试卷(含答案).pdf
- 水利监理质量控制体系.doc
- [五年级英语下册.doc VIP
- 《江西省宜春市明月山机场航站楼装修工程》投标技术标文件.doc
- GB_T 15114-2023 铝合金压铸件.docx
- 2021年第四期1+X建筑信息模型(BIM)职业技能初级实操题(三).pdf VIP
- 【最全】usedtodo,beusedtodoing用法辨析及练习(带答案).pdf VIP
- 财务报表审计模拟实训第六版刘雪清答案.pdf
- 广东省广州市天河区2020-2021学年八年级下学期期末考试英语试题(word版 含答案).docx VIP
- 招投标法律法规学习培训PPT.pptx VIP
文档评论(0)