网站大量收购独家精品文档,联系QQ:2885784924

大型公建项目室内管线综合问题的探讨(Discussion on the comprehensive problems of indoor pipeline of large-scale public construction projects).doc

大型公建项目室内管线综合问题的探讨(Discussion on the comprehensive problems of indoor pipeline of large-scale public construction projects).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大型公建项目室内管线综合问题的探讨(Discussion on the comprehensive problems of indoor pipeline of large-scale public construction projects) Discussion on the comprehensive problems of indoor pipeline of large-scale public construction projects Release date: 2012-11-24 10:44:11 An overview, with the great development of science and technology, all kinds of new technology, new technology is widely applied in construction projects, especially large public projects, mechanical and electrical equipment engineering increasingly to the big system, the direction of multi-parameter and complication. Therefore, the requirements for the integrated design and construction of mechanical and electrical equipment and pipeline engineering are higher and higher. This paper discusses the comprehensive design and construction of indoor pipeline of large-scale public construction projects. File is big, city plaza underground for the whole complex projects biggest energy power and control center, including substation, transformer room, cooling machine, so the heat exchange station, fire control center, program-controlled exchange room hotel, the hotel gas-fired boiler room, diesel generator room, all kinds of air conditioning room, fresh air to exhaust room, ventilation equipment room, computer room. All kinds of pipeline is complex, including dense bus, strong and weak current bridge frame, air tube, exhaust duct, the exhaust pipe, air conditioning refrigeration for return pipe, air conditioning cooling for return pipe, heating pipe, hot and cold water pipes, forced drainage pipe, storm sewer, fire hydrant pipe, spray. In order to ensure the project equipment and pipeline system in use process give full play to the role of the security and stability, high efficiency, the equipment and pipeline system design, installation, construction technology and quality control is extremely important. 2, the design of the indoor pipeline comprehensive mechanical and electrical equipment engineering design, each sys

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档