南开大学 13春学期《工程施工》在线作业(Nankai university 13 spring semester project construction online homework).doc

南开大学 13春学期《工程施工》在线作业(Nankai university 13 spring semester project construction online homework).doc

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
南开大学 13春学期《工程施工》在线作业(Nankai university 13 spring semester project construction online homework) 13 spring semester project construction online homework 1. Known work P has a tight after G, G to work at the latest finish time for 14 days, lasts for 3 days, the total time is 2 days P work for 6 days, the earliest start time duration for l days, then P work of free time for the () day 1 A. 2 B. 3 C. 4 D. A: B full score: 2 points: 2 2. In the network plan, total H working time for 3 days, there are three tight work after H J, K, L, J the earliest starting time of work and the latest starting time 21 and 22 days respectively, and the work of K the earliest completion time and the latest finish time is 23 and 25 days respectively, the earliest starting time and L work at the latest starting time is 21 and 23 days, respectively, work free time for the () day of the H 1 A. 2 B. 3 C. 4 D. A: B full score: 2 points: 2 3. In the case of the double code network graph drawn by the calculation period, the following statement is incorrect () A. In addition to the starting point of the network, each nodes time scale is the earliest completion date of A work B. In addition to the network endpoint, each nodes time scale is the earliest start time of a work C. Total time difference is not zero. The horizontal projection length of the arrow line at the time axis is not equal to the duration of the work D. The node of the waveform arrow is not just a node of an arrow Score: 2 4. Using the precast member of the stacking method, the concrete strength of the lower layer and at least the design strength are achieved when the concrete is cast. A. 20% B. 30% 40% C. D. 50% A: B full score: 2 points: 2 5. The construction of prestressed reinforced concrete in pretensioned prestressed concrete is required, and the strength of concrete is not lower than that of the design strength. A. 75% B. 80% 85% C. D. 100% A full score: 2 points: 2 6. When the template and bracket of the cast-in-place floor

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档