二级建造师历年真题精选(一)(A selection of the original title of a secondary constructor (1)).doc

二级建造师历年真题精选(一)(A selection of the original title of a secondary constructor (1)).doc

  1. 1、本文档共31页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
二级建造师历年真题精选(一)(A selection of the original title of a secondary constructor (1)) Now studying in our school students associate constructor has learned construction regulations and the relevant knowledge and the construction of the project construction management two courses, practice part is according to the date of the schedule is normal. In order to be able to pass the construction teacher exam of 2009, the author also keeps organizing relevant years of the thesis for your reference. The answer is attached to the next page. Happy learning! 1. Single item selection (total 60, 1 point per item). Only 1 of each option is most suitable for the question. 1. () is the most basic safety management system in building production, which is the core of all safety rules and regulations. A, quality accident handling system B, quality accident statistics reporting system C, safety production responsibility system D, safety production supervision system 2. The basic system of construction safety production management shall not include (). A, group prevention system B, casualty report system C, accident prevention system D, safety accountability system 3, the construction engineering safety production management regulations stipulated in article 10, in accordance with the approval of work-start reports of construction projects, the construction unit shall from the date of approval of work-start reports (), to ensure safety construction measures of the construction of the local peoples governments at or above the county level of the local construction administrative departments and other relevant departments for the record. A, 30 days B, 60 days C, 15 days D, 90 days 4. During the implementation of the supervision process, the project supervision unit shall require the construction unit to rectify the hidden dangers. If the situation is serious, the construction unit shall be required to suspend construction temporarily and report the construction unit in time. If the construction

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档