- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
卫生洁具安装技术(Sanitary ware installation technique)
Principle of cleanser - process - technology:
Introduce sanitary ware installation technology for you. The following contents are arranged by purchasing website for your reference.
1. Material requirements 1.1
The specification and model of sanitary ware must meet the design requirements; And have factory product certificate. Sanitary ware appearance should behave, the shape of the week is positive, the surface is smooth, beautiful, no crack, edge is smooth, tonal and consistent. 1.2
Sanitary ware parts specifications should be standard, the quality should be reliable, the appearance is smooth, the plating is even, the thread is clear, the lock mother is elastic and moderate, no sand eye, crack and so on defects. The water tank of sanitary ware shall be watertight. 1.4
Other materials: galvanized pipe fittings, leather money cut-off valve, horoscope, water mouth, threaded valve return water, drain and turn galvanized split bolt, nut, rubber plate, copper wire, putty, lead leather, screw, solder, hydrochloric acid and lead, linen, silk, asbestos rope, white cement, white plaster shall conform to the requirements of the material standard, etc. 2. Main machine tools 2.1
Machine tools: wire machine, grinding wheel, grinding wheel saw, hand electric drill, impact drill. 2.2
Tools: pipe tongs, hand saws, iron, scissors, live board hands, homemade dead spanner, fork wrench, hand hammer, hand shovel, chisel, cutter, square file, round file, screwdriver, soldering iron, etc. 2.3
Others: horizontal ruler, ruler, line falling, small line, box ruler, etc. 3. Operating conditions 3.1 all pipe pressure and closed water tests connected with sanitary fittings have been completed. 3.2
The stability of the tub should be done after the soil has been completed and the protective layer is completed. 3.3 other sanitary ware should be installed in the interior after basic finishing. 4. Operation process flow: installation preparation
Sanitary
您可能关注的文档
- 孔林导游词(The konglin guide).doc
- 媒介投放监控与广告效果评估(Media release monitoring and advertising effectiveness assessment).doc
- 媒体评估体系指标(Media evaluation system indicators).doc
- 复习题1(1 review).doc
- 奶山羊产奶量(Milk goats produce milk).doc
- 奶厅管理(Milk hall management).doc
- 宁夏回族自治区公路两侧建筑控制区管理办法(Administrative measures on the construction control area of the highway in ningxia hui autonomous region).doc
- 宁德港简介(About the port of ningde).doc
- 宁夏特色农产品产得出叫得响销得旺(Ningxia featured agricultural products to produce a sound to sell well).doc
- 女儿墙、阳台、窗、楼梯护栏高度(Women's wall, balcony, window, stair fence height).doc
文档评论(0)