交通局千名干部下基层 排忧解难促发展活动方案(Transport bureau a thousand cadres at the grass-roots level to promote the development of development programme).docVIP

交通局千名干部下基层 排忧解难促发展活动方案(Transport bureau a thousand cadres at the grass-roots level to promote the development of development programme).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
交通局千名干部下基层 排忧解难促发展活动方案(Transport bureau a thousand cadres at the grass-roots level to promote the development of development programme) Culvert construction scheme I. project quantity There are 285 x 250 double-hole boxes in this contract with 52.5 m / 2 seats, 285 x 250 double-hole cases with 60m / 2 seats, 300 x 250 cases with 101.4 m / 1 seats, 450 x 300 cases of 210.4 m / 1, and 182m / 2 seats of reinforced concrete circular pipe. Ii. Team and schedule The plan is to arrange the construction of three culvert teams, each of 42 people, a total of 126 people, after the start of the work, such as the labor shortage from local recruitment. The culvert team constructed 285 x 250 double-hole boxes with 52.5 m / 2 seats, 285 x 250 double-hole cases with 60m / 2 seats; Construction 300 x 250 boxes with 101.4 m / 1, and 182m / 2 seats of reinforced concrete circular pipe; Culvert three teams construction 450 by 300 boxes of 210.4 m / 1. Schedule: 30 days from 28 October to 26 November 2004; Construction period of 70 days from November 27, 2004 to February 4, 2005. Construction method 1. Circular pipe of reinforced concrete 1.1 basic engineering The excavation of foundation pit was excavated by artificial cooperative machinery. After the excavation of foundation pit was qualified, the paving layer was paved, and the compaction of the small vibratory roller was compacted, and the compaction degree reached more than 95%. The foundation concrete was poured twice before and after the installation of the pipe section, and the combination of old and new concrete and the combination of the pipe and concrete and the wall of the pipe were mainly controlled, and the maintenance was carried out in time. 1.2 construction Culvert pipe by the designated factory prefabrication, shipped to the site after inspection, the accurate calculation of pipe culvert length and the pipe joint configuration and the position of the end wall, starting from the downstream installation, make joint instal

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档