西南交《建筑工程概预算B》在线作业二(Southwest China construction project budget B online homework two).doc

西南交《建筑工程概预算B》在线作业二(Southwest China construction project budget B online homework two).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
西南交《建筑工程概预算B》在线作业二(Southwest China construction project budget B online homework two) Southwest China construction project budget B online homework two Total score: 100 test time: - Radio examination Radio examination questions (25 questions, 100 points) 1. material budget price means () A. material ex factory price B. material ex factory price and purchase and storage fee sum C. delivery price from the source to the warehouse after the construction site D. material supply price Full marks: 4 2. mechanical design of a construction of 6 years, the total number of 1500 classes is durable, the period of use of repair cycle for 3 times, a major repair cost is 6000 yuan, while the number for repairs (yuan). A. 16 B. 12 C. 8 D. 4 Full marks: 4 3. independent design documents, but after completion of the project can not independently play the production capacity or effectiveness of the project known as () A. construction project B. single project C. unit project D. segment Engineering Full marks: 4 4. the quota used for the construction drawing budget is () A. labor quota B. construction quota C. budget quota D. budget quota Full marks: 4 5. the base of additional educational fees is () A. profit B. sales tax C. direct fee + indirect fee D. direct fee + indirect cost + profit Full marks: 4 6. () is a reflection of the enterprise quota quantity standard quantity for consumption level A. design enterprise B. consulting enterprise C. tenderee D. bidder Full marks: 4 7. the off-site transportation loss of materials is included in A. material price B. transportation charges C. storage fee D. purchasing fee Full marks: 4 8. which of the following is not the characteristic of the project cost? ( A. large value B. dynamics C. professionalism D. stage Full marks: 4 9. for the expansion of the original construction project, the newly added fixed asset value is more than the original fixed capital value (or more than), and it also belongs to the new construction project A. two B. thr

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档