- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国石油北京《修井工程》第二阶段在线作业(The second phase of Chinas oil project in Beijing)
14 spring 13 autumn 13 spring China petroleum university petrochina Beijing - second stage online homework
Single option
Question 1. What is the incorrect expression of the well field investigation?
A, we must investigate the well position
B, the ground road must be investigated
C, the well site must be investigated
D, the pumping unit must be investigated
Problem 2 is the rate of injection of fluid displacement Wells at the time of the injection.
A, 0.3 m3 / min ~ 0.5 m3 / min
B, 0.5 m3 / min ~ 0.7 m3 / min
C, 0.7 m3 / min ~ 0.9 m3 / min
D, 0.9 m3 / min ~ 1.1 m3 / min
3 topic choose reverse twist wire rope underground work construction, use Φ 18.5 mm steel wire rope, wear 6 strands of rope specifications applicable to construction well how deep?
A, within 1,000 m
B, 1500m
C, within 2000m
D, 2500m
Question 4. What is the incorrect description of the requirements for the correction derrick?
A. After adjusting the derrick, the tension should be tightened around the front and back, and the force should be uniform.
B, you can see the screw in the observation hole on the garland screw.
C, skycar, floating block two lines
D. When the rope is stretched, the insurance rope is used to prevent the accident of the derrick.
Question 5. What is the correct way to check the circulation system?
A, manifold - import pipeline - faucet - outlet piping - set gauge
B, pipe remittance - import pipeline - hose - faucet - export pipeline - a set of pressure gauge
C, manifold - import pipeline - hose - export pipeline - pressure gauge
D, pipe remittance - import pipeline - faucet - hose - outlet pipe - pressure gauge
When the power line frame and the lighting frame are not lower than the height of meters?
A, 2 m, 1.2 m
B, 2.5 m, 2 m
C, 1.2 m, 2 m
D, 2.5 m, 1.2 m
Question 7. Which of the following options does not belong to process design?
A. construction procedures
B, oil field name, well number and well
C. Basic data
您可能关注的文档
- 仓储单选(Warehousing radio).doc
- 仓库管理制度(Warehouse management system).doc
- 产品的跟踪物料(Product tracking materials).doc
- 产品介绍(Product introduction).doc
- 产品美学(Product aesthetics).doc
- 产品评估(Product evaluation).doc
- 产品示范(Product demonstration).doc
- 串口并口PCI 接口总结(Serial interface and PCI interface summary).doc
- 串行实时时钟芯片DS1302程序设计中的问题与对策(Problems and countermeasures of serial real-time clock chip DS1302 program design).doc
- 串口连接线制作方法(Method of serial connection).doc
- 中国通用技术集团,领导力培养的四条主线(China general technology group, four main lines of leadership training).doc
- 中国药品通用名称命名原则(一)总则1 本命名原则中的药品一词包括(The term medicine in the name principle of general name of Chinese medicine includes).doc
- 中国营养食谱(China nutrition diet).doc
- 中国重大建设工程的生态问题论文(China's major construction project ecological problem paper).doc
- 中国著名机械企业(China famous machinery enterprises).doc
- 中国石油新走廊(China petroleum new corridor).doc
- 中国著名农产品区域公用品牌报表样本(Sample of public brand report of famous agricultural products in China).doc
- 中级车工考试题(Intermediate car test).doc
- 中级考试5(Intermediate test 5).doc
- 中级汽车修理工试题2(含答案)(Intermediate auto mechanics test 2 (including answers)).doc
文档评论(0)