中国石油北京《修井工程》第二阶段在线作业(The second phase of Chinas oil project in Beijing).doc

中国石油北京《修井工程》第二阶段在线作业(The second phase of Chinas oil project in Beijing).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国石油北京《修井工程》第二阶段在线作业(The second phase of Chinas oil project in Beijing) 14 spring 13 autumn 13 spring China petroleum university petrochina Beijing - second stage online homework Single option Question 1. What is the incorrect expression of the well field investigation? A, we must investigate the well position B, the ground road must be investigated C, the well site must be investigated D, the pumping unit must be investigated Problem 2 is the rate of injection of fluid displacement Wells at the time of the injection. A, 0.3 m3 / min ~ 0.5 m3 / min B, 0.5 m3 / min ~ 0.7 m3 / min C, 0.7 m3 / min ~ 0.9 m3 / min D, 0.9 m3 / min ~ 1.1 m3 / min 3 topic choose reverse twist wire rope underground work construction, use Φ 18.5 mm steel wire rope, wear 6 strands of rope specifications applicable to construction well how deep? A, within 1,000 m B, 1500m C, within 2000m D, 2500m Question 4. What is the incorrect description of the requirements for the correction derrick? A. After adjusting the derrick, the tension should be tightened around the front and back, and the force should be uniform. B, you can see the screw in the observation hole on the garland screw. C, skycar, floating block two lines D. When the rope is stretched, the insurance rope is used to prevent the accident of the derrick. Question 5. What is the correct way to check the circulation system? A, manifold - import pipeline - faucet - outlet piping - set gauge B, pipe remittance - import pipeline - hose - faucet - export pipeline - a set of pressure gauge C, manifold - import pipeline - hose - export pipeline - pressure gauge D, pipe remittance - import pipeline - faucet - hose - outlet pipe - pressure gauge When the power line frame and the lighting frame are not lower than the height of meters? A, 2 m, 1.2 m B, 2.5 m, 2 m C, 1.2 m, 2 m D, 2.5 m, 1.2 m Question 7. Which of the following options does not belong to process design? A. construction procedures B, oil field name, well number and well C. Basic data

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档