中国铁路隧道技术发展(Technical development of railway tunnel in China).doc

中国铁路隧道技术发展(Technical development of railway tunnel in China).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国铁路隧道技术发展(Technical development of railway tunnel in China) China railway tunnel technology development China is a vast and mountainous country, with more than two-thirds of its mountainous area, high plateau and mountains, mountains and mountains, rivers and rivers. For the development of railway construction, a lot of tunnels need to be built, and many long tunnels and long tunnels will be built, so the construction of railway tunnels is extremely difficult and complicated Tunnel construction technology is a comprehensive technology which covers a wide range of specialties and intersections. For more than a century, the development of China railway tunnel construction technology can be divided into three periods: Before the founding of the Peoples Republic of China (1888-1949), the Peoples Republic of China (1888-1949) was basically a period of human excavation, manual operation, simple machine, and backward technology. At that time, the railway tunnel construction had no fixed professional technical team, no complete design, construction specification, equipment and equipment was small, the method was simple, the labor intensity was large, the efficiency was very low. The length of the tunnel over 3km is only three. 2. In the 1950s and 1970s, the railway developed rapidly and the construction of tunnels was mainly transferred to middle and small machinery, which was a period of great development of tunnel design and construction technology. Starting in the 50 s, attaches great importance to the tunnel construction of professional team to form the ministry of railways, and gradually develop the railway tunnel survey design, construction specification and tunnel structure gauge standard, compiled some tunnel construction standard design. In this paper, the measurement design of plane control measurement is made, and the calculation formula of the penetration error is proposed. The measurement method is based on the triangulation and traverse method of two baseline

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档