生产与作业选择(Production and job selection)
Production and operation management review questions and answers (single choice questions)
1. The production line composed of the equipment cannot be equal, and the capacity of the production line is determined ().
A. manual operation ability b. minimum working capacity c. artificial management ability d. maximum process capability
2. Static investment payback period is applicable to assessment ()
A. Short-term programme b. medium-term plan c. long-term programme d. short, medium and long-term programmes
3. Product quality indicators can reflect the appearance quality of products. The following shall not be of the appearance quality of the product ()
A. work accuracy b. product appearance c. product package d. product color
4, some mechanical enterprise, there are two main section, the assembly and machining, assembly production cycle known for 10 days, machining production cycle for 16 days, the section between the safety period of 2 days, is the enterprise machining production lead time for ()
A. 12 days b. 24 days c. 26 days d. 28 days
5. The meaning of the symbols used in the process flow chart is ()
A. test b. carry c. work d. store
6. When abnormal loss of working hours (), only verbal reports are made, and abnormal reports are not filled.
A. 10 b. 15 c. 20 d. 30
7. The abbreviation for product assembly and packaging process control is ()
A.F QB B.F QC C.A QL d. f QA
8. When the net present value is equal to (), the corresponding discount rate is nearest to the intrinsic reward rate of the scheme itself.
A. 0.0005 B. 0.005 c. 0.05 d. 0.5
9. The production process that basically limits the production capacity of the enterprise is ()
A. general production link b. assist production link c. lead production link d. any production link
10. Stable production, relatively single product variety, large production, and relatively stable production process of the workshop and the division of labor in each workshop.
A. Advance method b
您可能关注的文档
- 西方现代艺术的看法(The view of Western Modern Art).doc
- 西瓜的吃法(Watermelon Eating method).doc
- 西方发达国家会计国际化进程比较及其对我国的启示(Comparison of accounting internationalization in western developed countries and Its Enlightenment to China).doc
- 西瓜作用(Watermelon action).doc
- 西红柿炒鸡蛋(Scrambled egg with tomato).doc
- 西方经济学题2(Western economics question 2).doc
- 西交《发电厂热力设备(高起专)》在线作业(West to the power plant thermal equipment (high starting special) online operation).doc
- 西交《钢结构基本原理》在线作业(Online operation of the basic principles of steel structure).doc
- 西红柿和螃蟹一起吃产生砒霜(辟谣)转的啊(Tomatoes and crabs eat together to produce arsenic (rumor) turn ah).doc
- 西交《混凝土结构》在线作业(Online operation of concrete structure).doc
- 2025年超星尔雅学习通《劳动通论》章节测试及参考答案【能力提升】.docx
- 2025年社区工作者考试试题库附答案(精练).docx
- 2025年法律常识题库word.docx
- 2025年计算机知识题库含大题及参考答案【综合题】.docx
- 2025年计算机知识题库含大题附参考答案ab卷.docx
- 2025年法律常识题库带答案(培优b卷).docx
- 2025年国家电网招聘之经济学类考试题库附参考答案【达标题】.docx
- 2025年注册消防工程师之消防安全技术实务题库及参考答案(培优).docx
- 2025年中国聚四氟乙烯不粘涂料项目投资可行性研究报告.docx
- 2025至2030年中国大屏幕手机行业市场竞争格局分析及投资方向研究报告.docx
文档评论(0)