生活垃圾处理工程(Life refuse treatment works).docVIP

生活垃圾处理工程(Life refuse treatment works).doc

  1. 1、本文档共28页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
生活垃圾处理工程(Life refuse treatment works) Water supply and drainage engineering major in 2011 Environmental engineering Mechanical equipment engineering professional construction environment and equipment engineering major, design required basic information Ii. The main documents and standards adopted by the design 3. The main content of urban household garbage disposal project: 4. The calculation of life garbage quantity and the analysis of garbage components, and the overall plan of garbage collection and disposal of urban life Six, garbage collection, temporary storage and transportation system design seven, eight, garbage disposal waste transfer station design engineering design 1, urban planning data manual   overall plan and planning  1    status of the population, population planning population  2    the scope of urban land   3 social  the local industrial and agricultural production development, economic development situation Situation. 2. Urban or county aspirations  1   the development of the city and history    2 environmental conditions, the natural disasters 3. Current status of garbage quantity and garbage nature 4, meteorological data  the average annual temperature   1 2    extreme maximum temperature  3  extreme minimum temperature    4 days frost-free period   5  rainfall    the maximum rainfall including annual average rainfall Once every 20 years the largest  and monthly rainfall distribution    6 annual evaporation 7  annual average sunshine hours   Relative humidity    8 years  9  dominant wind direction and wind. 5. Topographic map of garbage disposal site Feasibility study, set at the beginning of the latter  1   1:500   2 construction drawing design. 6. Geological survey data of garbage dump engineering 1   feasibility study stage A preliminary data  At the beginning of   2 set, construction drawing design phase XiangTan data. 7, local building materials supply  all kinds of material pri

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档