- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
固定床反应器(Fixed bed reactor)
Fixed bed reactor unit simulation training system
Operation instruction
Beijing Orient simulation software technology co. LTD
October 2006
Orders to record
1. Process description 2
1. Process specification 2
2. The complex control loop of this unit indicates 2
3. Equipment overview 2
2. Operation procedure of fixed bed reactor unit 3
1. Driving operation procedure 3
2. Normal operation procedure 4
3. Parking operation procedure 4
4. Interlock specification 5
5. Appearance and alarm list 6
3. The accident setting is in view 7
4. Simulation interface 8
Question 10
I. process description
1. Process description
This process is used to catalyze the process of catalytic hydrodeacetylene. Acetylene is removed by an isothermal hydrogenation reactor, and the reactor temperature is controlled by the temperature of the cold agent in the shell side.
The main reaction is: nC2H2 + 2nH2? (C2H6) n, this reaction is exothermic. The heat is about 34,000 kcal after each acetylene reaction. Temperature over 66 ℃ has side effects for: 2 nc2h4? (C4H8) n, the reaction is also exothermic.
The cooling medium is liquid butane, and the heat from the reactor is removed by the evaporation of butane, and the butane vapor condenses through the cooling water.
Reaction raw material is divided into two shares, a shares for about 15 ℃ is given priority to with C2 hydrocarbon raw materials, feed rate is controlled by a flow controller FIC1425; Another for H2 and CH4 mixture, temperature around 10 ℃, the feed rate is controlled by a flow controller FIC1427. FIC1425 and FIC1427 as ratio control, two raw materials according to certain proportion after mixing the raw material in the pipeline gas/reaction gas heat exchanger (EH - 423) preheating, then through raw material preheater (EH - 424) preheating to 38 ℃, in fixed bed reactor (ER - 424 - a/B). The preheating temperature is controlled by the temperature controller TIC1466 by regulating the flow of the preheater eh-424 heatin
您可能关注的文档
- 电力系统自动装置简答(The power system automatic device short answer).doc
- 电控发动机点火系统的故障与排除(Failure and removal of ignition system of electric control engine).doc
- 电喷车冷起动困难故障的修复(The repair of the difficult fault of the electric spraying vehicle).doc
- 电力系统自动装置原理(The principle of power system automation).doc
- 电气安全教育(Electrical safety education).doc
- 电喷雾技术制备在纳米材料制备中的应用(Application of electrospray technology in preparation of nanometer materials).doc
- 电气常识(Electrical knowledge).doc
- 电气工程管理论文(一)(Electrical engineering management paper (1)).doc
- 电气工程及其主动化专业以后出来工作能够干什么(Electrical engineering and its active major will come out after work can stem what).doc
- 电气控制核心技能理论知识试卷3(Electrical control core skills theory knowledge paper 3).doc
文档评论(0)