表一 旬阳县2009年元至6月重点项目建设进度一览表(Table 1 schedule of key project construction in Xunyang county from June to 2009).doc
- 1、本文档共37页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
表一 旬阳县2009年元至6月重点项目建设进度一览表(Table 1 schedule of key project construction in Xunyang county from June to 2009)
Table 1 schedule of key project construction in Xunyang county from June to 2009
Unit: 100 million yuan
Serial number
entry name
build
category
Current construction objective
Hanging together
Leader
Packaging Department
Responsible person
Project schedule
Existing problems and
Next job plan
One
Xunyang thermal power plant *
Early stage
work
Complete feasibility studies and supporting documentation.
Chenwuwen
Planning Bureau
Dengbangcai
Has completed the preparation and review of the feasibility study report, enter the closing stage; the provincial support file has made most.
Expedite project progress and obtain approval as soon as possible.
Two
Production line of 100 thousand tons of alloy *
Early stage
work
Complete feasibility study.
Jun Jie Zou
Planning Bureau
Dengbangcai
Project proposal has been completed.
Actively attract investment
Three
Production line of annual output of 100 thousand tons of magnesium *
Early stage
work
Complete feasibility study.
As
Planning Bureau
Dengbangcai
Project proposal has been completed.
Actively attract investment
Four
Annual production capacity of 1 million 200 thousand tons of pellets iron,
600 thousand ton sponge iron production line *
Early stage
work
Complete project proposal.
Chenchangxue
Economic and Trade Bureau
Yang
A feasibility study is being prepared.
Preliminary review work is required
Five
Annual production line of 100 thousand tons of zinc smelting *
Early stage
work
Completion of the approval, and strive to start construction, the completion of investment 100 million yuan.
Zhao-Yang Zeng
Federation of industry and Commerce
Ouyanghe
Only the EIA procedures, the Municipal Environmental Protection Bureau of the pre-trial opinion, total emissions targets, EIA simplified all in place, has been the Provincial Department of environmental protection and environmental protection department, has accepted.
Actively at
您可能关注的文档
最近下载
- 煤矿安全管理经验交流(第二版).ppt VIP
- 一级消防工程师《消防安全技术实务》精讲讲义.pdf
- (适用于课堂教学的背景图.ppt VIP
- 天津大学论文答辩PPT模板.pptx VIP
- 生物化学与分子生物学:第13章 真核基因与基因组.ppt VIP
- 2025形势与政策-加快建设社会主义文化强国.pptx
- 人教版(2025)七年级下册Unit1Animal FriendsSection B How are animals part of our lives Section B 1a~2b课件+音频(共3.pptx VIP
- 110kv变电站继电保护毕业设计.doc VIP
- 公路隧道工程施工.pptx
- 电信行业运营商业务连续性保障方案.doc VIP
文档评论(0)