水泥砂浆面层施工工艺(Construction technology of cement mortar face layer).docVIP

水泥砂浆面层施工工艺(Construction technology of cement mortar face layer).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水泥砂浆面层施工工艺(Construction technology of cement mortar face layer) 1.1 construction technology of cement mortar face layer I. construction points (1) before laying the surface layer, water the grass roots at the grass roots first, and then brush the water cement with a water cement ratio of 0.4 ~ 0.5, and then spread the surface layer. If the cement slurry combination layer is too early, it will not be able to bond with the base layer and the surface layer. Instead, it will cause the ground air drum. So, be sure to stick with the brush. (2) the cement floor is pressed three times. The time needed to control the pressure must be mastered to ensure the quality of the project. Too early or too late can cause ground sand and ash quality accidents. (3) local surface area is larger, the design requirements when the compartment, should be based on the position and size of the frame line on the ground, on the wall or add points on foot row GeCheng position, after scraping wipe rubbed surface mortar, according to a wall or to add on the foot has rowed good points, lines, rubbing a treaty in wood float float first wide surface, iron float shall be used first, calender, gently with a chalk line bag bounced on the line, with ground frame clingy rowed out on foot along line seam. Before the cementing of the surface layer, the pressure of the steel skin is pressed flat, and the dividing seam is flattened. Construction preparation Material preparation: cement, sand, water Sand is generally used in sand or coarse sand, and the mud content should not be greater than 3%. When stone chips are used, the particle size is 1 - -5mm, and the amount of powder (containing mud) is not greater than 3%. The standard should be sifted and dealt with (2) equipment preparation: 1. Machine: mortar mixer 2. Tools: wheelbarrow, scraping bar, wooden spatula, iron trowel, angular float, shovel, small bucket, watering pot, sieve, long brush, broom, wire brush, deed, hammer, etc 3. Measuring instruments: wat

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档