露采(Opencast mining).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
露采(Opencast mining) Mining equipment working face elements: height, workingsurfaceexcavation belt width, length, width of flat work area Steps: safety platform, transport platform, cleaning platform Security platform width: usually 1/3 step height, generally not less than 4m Transportation platform: its width is determined by the mode of transportation and number of lines used Cleaning platform: its width depends on the cleaning equipment used Three important mining projects: trenching, stripping and mining Development procedure of mining engineering: step mining procedure, work help tunneling and new level development and extension New level preparation includes: dig into the ditch, ditch, slope expansion period Open pit mining project: according to construction object: stripping project and mining engineering. According to the form of Construction: ditch excavation and retaining works. For a step: dig into the ditch - open ditch slope expansion section The preparation of ore and rock must be done by blasting, mechanical and hydraulic methods. The reasons for the high efficiency of the full - scale trenching of loading cars on railway transportation are higher than those of the paperback cars: When the car is excavated, the train needs disassembly and frequent mobilization when it is loaded, but the train needs no disassembly and mobilization when the whole section is excavated The following basic requirements for ore and rock after blasting: 1, the demolition reserves enough, at least 5 10 days a shovel can meet the production needs.... (of the amount of ore or rock needed). 2, to have qualified ore lump requirements: (quality requirements) Shovel: a=0.8 3 V Crusher: a=0.8A Belt conveyor: a= (0.3 - 0.4) B 3, there must be regular explosion heap and step. 4, safety: shock absorption, reduce shock wave, pay attention to stone throwing. 5. Economy: the economy of the blasting itself: reasonable charging structure, initiation methods, blasting methods, total mining an

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档