- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
露采(Opencast mining)
Mining equipment working face elements: height, workingsurfaceexcavation belt width, length, width of flat work area
Steps: safety platform, transport platform, cleaning platform
Security platform width: usually 1/3 step height, generally not less than 4m
Transportation platform: its width is determined by the mode of transportation and number of lines used
Cleaning platform: its width depends on the cleaning equipment used
Three important mining projects: trenching, stripping and mining
Development procedure of mining engineering: step mining procedure, work help tunneling and new level development and extension
New level preparation includes: dig into the ditch, ditch, slope expansion period
Open pit mining project: according to construction object: stripping project and mining engineering. According to the form of Construction: ditch excavation and retaining works. For a step: dig into the ditch - open ditch slope expansion section
The preparation of ore and rock must be done by blasting, mechanical and hydraulic methods.
The reasons for the high efficiency of the full - scale trenching of loading cars on railway transportation are higher than those of the paperback cars:
When the car is excavated, the train needs disassembly and frequent mobilization when it is loaded, but the train needs no disassembly and mobilization when the whole section is excavated
The following basic requirements for ore and rock after blasting:
1, the demolition reserves enough, at least 5 10 days a shovel can meet the production needs.... (of the amount of ore or rock needed).
2, to have qualified ore lump requirements: (quality requirements)
Shovel: a=0.8 3 V
Crusher: a=0.8A
Belt conveyor: a= (0.3 - 0.4) B
3, there must be regular explosion heap and step.
4, safety: shock absorption, reduce shock wave, pay attention to stone throwing.
5. Economy: the economy of the blasting itself: reasonable charging structure, initiation methods, blasting methods, total mining an
您可能关注的文档
- 齿轮噪音原因分析(Cause analysis of gear noise).doc
- 错误百出的柴静《穹顶之下》(Jing Chai riddled with errors beneath the dome).doc
- 除氧站(Oxygen removal station).doc
- 错误和警告解析1(Error and warning resolution 1).doc
- 钓饵配方集锦(The bait formula.).doc
- 钓鲫鱼聚鱼法(Fish catching crucian carp).doc
- 钓具名词解释(Fishing tackle terminology).doc
- 钓鲢鳙(Silver carp and Bighead Carp Fishing).doc
- 钓鲶鱼(Catfish).doc
- 铂络合物(platinum complex).doc
- 露台封闭的必要性和法律依据(The necessity and legal basis of terrace closure).doc
- 铝标牌丝印工艺印刷要点及油墨选择(Printing process of aluminium sign and screen printing and selection of ink).doc
- 铝粉膏水泥发泡剂、发气铝粉制作配方及生产工艺技术文集(Aluminum powder, cement foaming agent, gas producing aluminum powder formulation and production process technology collection).doc
- 铝溶胶(Alumina sol).doc
- 麻辣点评期刊(Spicy Reviews).doc
- 麻省理工(MIT).doc
- 马拉松(Marathon).doc
- 马来西亚双峰塔(Shuangfeng tower, Malaysia).doc
- 驴友出行应该掌握(Alice travel should be master).doc
- 马棚网机械资讯机械词典大全(第355-627页)(The stable network information dictionary of mechanical machinery Daquan (pp. 355-627)).doc
文档评论(0)