马桶安装过程(Toilet installation process).docVIP

马桶安装过程(Toilet installation process).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
马桶安装过程(Toilet installation process) Buy a toilet: First of all, you need to know the form and distance of the required outfall. The form of the sewage outlet is generally divided into two kinds: ground arrangement and wall arrangement, and the general domestic toilets are arranged in the ground. Mouth distance refers to the distance from the axis of the sewage outlet to the edge of the toilet (usually the back edge of the body). Its very simple to install toilets: 1. leveling the ground so that the sewer pipe is slightly above the ground (first look at the difference between the discharge level of the new toilet and the edge below). 2. place the toilet flange (a gelatinous circle) on the aqueduct. 3. press the toilet from above to the flange. 4. connect the water supply stub. 5. when the ground is dry, place glass gel on the floor where the toilet is in contact with the ground. Ccccccccccccccc1, first measure the hole distance of the two fixed holes of the toilet, mark on the floor, hit two fixed toilets, and use the expansion screw size of 8 millimeters; 2. Clean the floor; 3. Put the sealing ring at the exit under the toilet. The sealing ring is soft and soft, and the size can be enlarged or narrowed according to the size of the outlet; 4. Put the toilet seat on the screw and screw the nut; 5 、 take the water pipe and turn off the angle valve in advance; 6. Fit the button on the lid; 7, the toilet ground circle, hit the white glass glue, scrape with your fingers. 8, test the water, all OK gggggggggggggg dry installation method: 1, the ground defecation pipe from the ground 5mm height saw off, saw the mouth should strive to smooth. 2, the toilet installation plan on the ground, the use of a round hole in the bowel pipe. Arrange the installation line on the drawing, drill the drilling machine according to the location of the installation hole, 3/8, and the deep 55mm mounting hole. 3. The nylon wall plug is inserted into the mounting hole. 4. Turn the toilet on the r

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档