网站大量收购独家精品文档,联系QQ:2885784924

监理工作总结(Supervision work summary).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
监理工作总结(Supervision work summary) Luyuan Village Project Summary of supervision 07 2004 08 July December 30, 2004 The supervision unit (Chapter): Yixing city HTC Construction Supervision Co. Ltd. The general supervision engineer: The legal representative: Date: December 30, 2004 Jiangsu Provincial Department of construction supervision A project overview The construction project, the supervision scope and target list The approval documents of the project construction area of 12000 square meters Tao real estate development company in Yixing City, the construction unit of the project name Garden Village Party As representative hole South Village site The seismic fortification intensity of six refractory grade two The design life of 50 years safety level two A type of foundation base and 95 base structure of brick masonry type Six layers of eaves height 21.6m Roof tile ground cement mortar The doors and windows Aluminum Alloy windows, anti-theft door decorative coatings Warm water, water supply and drainage, Wei electrical and intelligent building Investigation unit of Yixing Architectural Design Institute of Design Institute of Wuxi Huadian unit Grade B qualification qualification grade B The person in charge of investigation Qian Junqing design director Song Xing Survey report no. 04-2-32 No. Registered architect certificate number and registered structural engineers and Certificate No. Tao is the construction unit construction and installation engineering company limited processinspection institutions of Yixing City trial plan Qualification level three qualification grade B The construction technology of the project manager is responsible for Kong Cheng Liang Xunchu The level of qualification certificate No. three titles qualification certificate number 6903008 The total contract project million contract quality grade quality structure The contract start date 2004.07.08 contract completion date 2004.12.30 The scope of supervision quality control in construction stage

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档