案例分析计算某砖混结构住宅土方分部各分项工程的工程量。(Case study to calculate the quantity of each sub item of the earthwork division of a brick concrete structure house.).doc

案例分析计算某砖混结构住宅土方分部各分项工程的工程量。(Case study to calculate the quantity of each sub item of the earthwork division of a brick concrete structure house.).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
案例分析计算某砖混结构住宅土方分部各分项工程的工程量。(Case study to calculate the quantity of each sub item of the earthwork division of a brick concrete structure house.) Case study: to calculate the quantity of each sub item of the earthwork division of a brick concrete structure house. First, key words: case analysis, calculation of earthwork division of each sub project works. Two, Abstract: a masonry structure, reinforced concrete strip foundation, according to the requirements of meter and list pricing norms requirements, the project list segment respectively and calculate the earthwork quantity. Three, related knowledge points: In the earthwork, how to apply the quota items? Dig and fill earthwork thickness within 300mm and leveling leveling apply within the item; trench bottom width is less than 3m, the long groove bottom is 3 times larger than the width of groove bottom of the excavation to dig trench geosyncline, sub; pit bottom in the area of 20 meters within the set of base pit digging; apply are digging party item above scope the. How is the depth of excavation determined? The depth of excavation is based on the elevation of the designed outdoor floor to the dimension of the bottom of the underlying cushion. How to divide dry soil and wet soil? Division of dry soil and wet soil should be based on the geological survey data as the standard, if there is no data to the underground water level above the water level as the standard, often for dry soil, water is wet soil, using artificial lowering underground water, soil water in dry wet partition prevail. How to the meter, dig trench, medium trench backfill, backfill ground engineering calculation? The construction of the site shall be based on the outer edge of the outer wall at the bottom of the building, with 2m added to each side and calculated in square meters. The groove quantity is calculated by the slot length and the cross sectional area. Groove length: the exterior wall is calculated according to the length of the base cent

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档