- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土弊病(Concrete defects)
The appearance of defects in concrete engineering
A honeycomb
(1) with inaccurate measurement, aggregate grading is not good;
(2) uneven stirring;
(3) template leakage;
(4) the vibration is not enough or leakage of vibration;
(5) a pouring concrete layer is too thick, not clear, concrete transfer is not clear, unable to grasp the quality of the vibration;
(6) free fall height exceeds the concrete segregation and gravel pile driving;
(7) the vibrator is damaged, or when the power failure caused by leakage of vibration monitoring;
(8) the vibration time is not sufficient, the bubble is not excluded.
Two, Ma
(1) the same honeycomb reasons;
(2) the template cleaning is not clean, or early form removal, template adhesion;
(3) release agent brushing unevenness or leak brush;
(4) no watering wood wet concrete surface, dehydration, powder;
(5) the pouring time is too long, the template hanging ash too much not cleared up, causing the surface layer is dense;
(6) the vibration time is not sufficient, the bubble is not excluded.
Three holes
(1) the same cellular reason;
(2) reinforced concrete aggregate is too thick, too thick, not easy to dust, not easy to vibrate;
(3) the hole bottom, no concrete template outlet within the balloon.
Four, reinforcement
(1) the same honeycomb reasons;
(2) no steel skeleton processing, the top post template;
(3) the lack of protective layer pad;
(4) bar too close;
(5) no reinforcement measures, reinforcement displacement positioning punch.
Five, rot
(1) template root gap blockage lax leakage;
(2) before pouring concrete with no stone mortar not below than the same ingredients;
(3) the workability of concrete, water cement ratio is too large stone sink;
(4) pouring height is too high, a centralized concrete material, concrete or stones piled high on the rush;
(5) vibrator is not real;
(6) mold clean-up net, wet is not good.
Six, missing edge off angle
(1) the template design is not considered to prevent stripping off angl
您可能关注的文档
- 煤球机(Briquette machine).doc
- 煤炭资源开发利用方案编写内容及审查大纲(Contents and review outline of the scheme for the development and utilization of coal resources).doc
- 生产汽车扰流板 材质要塑料(Plastic material for automobile spoiler).doc
- 生产装配车间常用英语(Production assembly workshop common English).doc
- 生动地解释难懂的网络名词(A vivid explanation of obscure Internet Terms).doc
- 生个标准体重宝宝(Give birth to a standard weight baby).doc
- 生活百科201102(Encyclopedia of life 201102).doc
- 生活健康(Life health).doc
- 生活垃圾处理工程(Municipal solid waste treatment project).doc
- 生活巧门(The door of life).doc
最近下载
- 2023年苏州卫生职业技术学院单招职业适应性测试模拟试题及答案解析.docx VIP
- 大疆 DJI Matrice 4 系列 - 用户手册 v1.0.pdf
- 2025年北京海淀区九年级中考二模英语试卷试题(含答案详解).pdf VIP
- 供应商评审表(代理商及贸易商类-现场评审).pdf VIP
- 2024年苏州卫生职业技术学院单招职业适应性测试模拟试题及答案解析.docx VIP
- 2023年陕西省初中学业水平考试生物、地理试卷含答案.docx
- 11BS3 给水工程(华北标图集).docx
- 2025年苏州卫生职业技术学院单招综合素质考试模拟试题及答案解析.docx VIP
- 2025年苏州卫生职业技术学院单招职业适应性测试模拟试题及答案解析.docx VIP
- HGT 4120-2024《工业氢氧化钙》.pdf
文档评论(0)