建筑工程预算问题集(Construction project budget problem set).docVIP

建筑工程预算问题集(Construction project budget problem set).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑工程预算问题集(Construction project budget problem set) The 2000 contribution by Yu Bin Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view. 1 Q: supported by the post rain Peng engineering quantity calculation? Answer: 1 cast-in-place concrete canopy by icon size to calculate the quota of cubic meters, apply the corresponding quota. But from the rational perspective, or according to the beam and plate fixed to. 2 Q: now pick out pouring outside the framework of an outdoor corridor floor slab or how to implement the quota? Answer: 2 respectively according to the beam, plate or beam plate to the corresponding quota. 4 Q: the basement can calculate the foot fee? 4 A: the basement area can be included in the composite scaffold. 5 Q: with different raft foundation how to correctly apply quota? 5 A: still apply raft foundation, the reinforcement calculation according to the construction drawings. Question 6: hybrid structure engineering using the derrick, how to calculate the mechanical access fee? 6 A: derrick not large machinery, thus excluding machinery import charges. Question 7: one or two kinds of hoisting machinery import field, the ground reinforcement or take measures such as how to calculate the piling, cost? 7 A: the cost of construction fees, calculated by the construction unit, can refer to the relevant quota calculation or experience. 8 Q: used in the construction of bamboo instead of steel template, be adjusted? Answer: no 8. 9 Q: Calculation of ultra high time-consuming high-rise building, concave balcony area should be how to calculate? 9 A: concave balcony area by half (no envelope). Question 10: how to adjust the field of machinery import fee? Mechanical fee adjustment can enter the direct fee? Answer: according to the provisions of the 10 quota meter (Zhejiang province quota appendix relevant import fees can be included in the field), direct costs. 12 Q: well lift scaffold

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档