建筑消防工程竣工调试方案(Construction fire fighting project completion commissioning program).doc

建筑消防工程竣工调试方案(Construction fire fighting project completion commissioning program).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑消防工程竣工调试方案(Construction fire fighting project completion commissioning program) Completion of the building fire engineering commissioning scheme A, Project overview The fire control system commissioning is the main content: integrated debugging of automatic fire alarm and linkage system, water sprinkling system, hydrant system, gas fire extinguishing system, foam fire extinguishing system, smoke control system of fire and other fire fighting systems. Two, Engineering data check and test preparation 2.1 check data and on-site engineering equipment 2.1.1 fire hydrant system 2.1.1.1 fire hydrant box (including water, water and other accessories) should have the national fixed fire extinguishing systems and components of quality supervision and inspection center effective inspection report. 2.1.1.2 pump combination device should have the national fixed fire extinguishing systems and components of quality supervision and inspection center effective inspection report. 2.1.1.3 fire pump should have national fixed fire extinguishing systems and components of quality supervision and inspection center effective inspection report. 2.1.1.4 fire pump control cabinet should have fire 24V DC power supply to control the contact start stop action (action current is less than 1A); at the same time provide two sets of working state (starting state and stop state) passive contact. The fire pump control cabinet power supply should be mutual investment with a dual power supply. 2.1.1.5 fire pressure tank should have a national fixed fire extinguishing systems and components of quality supervision and inspection center effective inspection report. 2.1.2 smoke control system 2.1.2.1 exhaust valve, fire valve should have a national fixed fire extinguishing systems and components of quality supervision and inspection center effective inspection report. 2.1.2.2 exhaust fan, positive pressure fan should have national fixed fire extinguishing systems and components of quality supervision and

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档