- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑消防工程竣工调试方案(Construction fire fighting project completion commissioning program)
Completion of the building fire engineering commissioning scheme
A,
Project overview
The fire control system commissioning is the main content: integrated debugging of automatic fire alarm and linkage system, water sprinkling system, hydrant system, gas fire extinguishing system, foam fire extinguishing system, smoke control system of fire and other fire fighting systems.
Two,
Engineering data check and test preparation
2.1 check data and on-site engineering equipment
2.1.1 fire hydrant system
2.1.1.1 fire hydrant box (including water, water and other accessories) should have the national fixed fire extinguishing systems and components of quality supervision and inspection center effective inspection report.
2.1.1.2 pump combination device should have the national fixed fire extinguishing systems and components of quality supervision and inspection center effective inspection report.
2.1.1.3 fire pump should have national fixed fire extinguishing systems and components of quality supervision and inspection center effective inspection report.
2.1.1.4 fire pump control cabinet should have fire 24V DC power supply to control the contact start stop action (action current is less than 1A); at the same time provide two sets of working state (starting state and stop state) passive contact. The fire pump control cabinet power supply should be mutual investment with a dual power supply.
2.1.1.5 fire pressure tank should have a national fixed fire extinguishing systems and components of quality supervision and inspection center effective inspection report.
2.1.2 smoke control system
2.1.2.1 exhaust valve, fire valve should have a national fixed fire extinguishing systems and components of quality supervision and inspection center effective inspection report.
2.1.2.2 exhaust fan, positive pressure fan should have national fixed fire extinguishing systems and components of quality supervision and
您可能关注的文档
- 板木支撑计算(Calculation of plate and wood support).doc
- 板式楼梯梯板厚度确定(Gangboard stair slab thickness determination).doc
- 成长历程作文(Growing up composition).doc
- 板式散热器的优缺点(Advantages and disadvantages of plate type radiator).doc
- 棒材和线材的区分(Distinction between bar and wire).doc
- 板柱(Plate column).doc
- 承德都市妇科引进最先进技术——宫腔镜取胚术(Introduction of the most advanced technique in Chengde urban gynecology -- hysteroscopic embryo taking).doc
- 持蛇女神(Snake goddess).doc
- 泵类基础知识(Basic knowledge of pumps).doc
- 泵轮叶片芯盒的设计与制作(Design and manufacture of pump wheel blade core box).doc
最近下载
- 机电安装工程调试方案.doc VIP
- 2024-2025学年初中数学八年级上册青岛版(2024)教学设计合集.docx
- 化工单元操作(浙大)中国大学MOOC慕课 章节测验期末考试客观题答案.docx VIP
- 2023-2024学年湖南省郴州市七年级(下)期末数学试卷(含答案).pdf VIP
- 酒店宾馆客房卫生检查表.docx VIP
- 标准图集-03S402-室内管道支架及吊架.pdf VIP
- 2024铁路隧道机械化施工技术指南.pdf
- 2024年中考语文备考之八年级上学期名著阅读《红星照耀中国》要点梳理+中考真题.docx VIP
- 《新闻编辑》课程考试复习题库(含答案).docx VIP
- 《建设项目工程总承包计价规范》解读与应用 (正式版).pptx
文档评论(0)