- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
搅拌站资料(Mixing station data)
1, mixing station production management system
The station did not command production owners or project manager department issued no startup concrete mixing.
It has no project department license shall not stop production or stop production repair.
The accurate input proportion; carefully retest all data entry, the test personnel, the operator after confirmation signed by the record, before production.
In strict accordance with the production, no laboratory test personnel written instructions, no one is allowed to arbitrarily increase or decrease of raw materials, additives and water use. The mixing time depends on the state, shall not arbitrarily or without the consent of the test personnel.
The production should be closely observed, measurement error exceeds the prescribed should adjust the gap. All measurement at no-load, should be in the range of the minimum value. Measuring system of other abnormal situation must timely report processing.
Such as cement, admixture, water error can not exceed 1%, cement, admixture quality is not enough, should be timely to find the auger is blocked, and promptly eliminate, aggregate error can not exceed + 2%, should be timely to find the reasons and manual compensation and record when the error exceed the standard time.
Water discharging, discharging port and tank inlet should be aligned, stop discharging omission.
According to the end of the process, the following closed switch:
The pump power switch;
The main power switch;
The general control switch;
The additive pump switch;
The air compressor switch;
Only after the work is completed within two hours, will host all contact parts of the concrete clean, must not appear for a period of time the cumulative raids phenomenon.
That fails in concrete production, immediately manually unloading, and cleaning related parts.
According to his instructions strictly enforce the mixing station.
Every time we start formal production and maintenance personnel must be
您可能关注的文档
- 彳亍法汉字记忆法(Walk slowly by Chinese characters memory method).doc
- 毕业工作以来的几点感悟(建筑学必读)(Several thoughts since graduation work (architecture must be read)).doc
- 抽象的色彩理论(Abstract color theory).doc
- 毕业论文心得俺博士三年的一点体会(Graduation thesis, Dr. I, three years of experience).doc
- 成为超级实习生的管理3个技巧(3 skills for managing super interns).doc
- 床垫销售技巧与话术(3)--介绍产品讲数字,还是打比喻(Mattress sales techniques and techniques (3) - Product Introduction speaking numbers, or figuratively speaking).doc
- 毕业论文心得二流学校硕士8篇sci的一点感受(Graduation thesis, second rate school, master's 8, SCI's a bit of experience).doc
- 毕业设计1(Graduation project 1).doc
- 毕业设计任务书(Graduation design task book).doc
- 打扫卫生小窍门 纱窗的清洁(Cleaning tips, window screen cleaning).doc
最近下载
- 管理学案例两面针公司.ppt VIP
- Roland罗兰GW-8说明书 中文.pdf VIP
- 亚吉铁路运营现状及问题分析.pdf VIP
- 2025年下半年新疆塔城地区急需紧缺人才引进243人笔试参考题库附答案解析.docx VIP
- 大理州旅游美宿基本要求与评价.pdf VIP
- 2025年国开电大机考网考题库04008_理工英语4.doc VIP
- 中建EPC项目总承包管理方法与实务2024.docx
- 2025年下半年新疆塔城地区急需紧缺人才引进243人笔试模拟试题及答案解析.docx VIP
- 2025年下半年新疆塔城地区急需紧缺人才引进243人笔试备考题库附答案解析.docx VIP
- 2025年铁路列车员(中级)职业技能鉴定参考试题库-下(判断题汇总).docx VIP
文档评论(0)