搅拌站资料(Mixing station data).docVIP

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
搅拌站资料(Mixing station data) 1, mixing station production management system The station did not command production owners or project manager department issued no startup concrete mixing. It has no project department license shall not stop production or stop production repair. The accurate input proportion; carefully retest all data entry, the test personnel, the operator after confirmation signed by the record, before production. In strict accordance with the production, no laboratory test personnel written instructions, no one is allowed to arbitrarily increase or decrease of raw materials, additives and water use. The mixing time depends on the state, shall not arbitrarily or without the consent of the test personnel. The production should be closely observed, measurement error exceeds the prescribed should adjust the gap. All measurement at no-load, should be in the range of the minimum value. Measuring system of other abnormal situation must timely report processing. Such as cement, admixture, water error can not exceed 1%, cement, admixture quality is not enough, should be timely to find the auger is blocked, and promptly eliminate, aggregate error can not exceed + 2%, should be timely to find the reasons and manual compensation and record when the error exceed the standard time. Water discharging, discharging port and tank inlet should be aligned, stop discharging omission. According to the end of the process, the following closed switch: The pump power switch; The main power switch; The general control switch; The additive pump switch; The air compressor switch; Only after the work is completed within two hours, will host all contact parts of the concrete clean, must not appear for a period of time the cumulative raids phenomenon. That fails in concrete production, immediately manually unloading, and cleaning related parts. According to his instructions strictly enforce the mixing station. Every time we start formal production and maintenance personnel must be

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档