后浇带(Post pouring zone).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
后浇带(Post pouring zone) The pouring belt is in construction to prevent the cast-in-place reinforced concrete structure due to harmful cracks temperature, uneven shrinkage may have, in accordance with the requirements of design and construction specifications, in the basement, walls, beams corresponding to the position setting temporary construction joints, the structure is divided into temporary cadres if, after internal contraction at some time after pouring the concrete construction joints, the structure as a whole. The pouring time of the pouring belt should choose low temperature, available pouring cement or cement mixed trace aluminum concrete, its strength should be higher than the component strength, to prevent the occurrence of cracks between new and old concrete, resulting in weak position. The pouring belt parts should also consider consumption factors of different measures such as template. Definition English Name: post-cast strip. The pouring belt is not only can solve the differential settlement and effective measures to reduce shrinkage stress, it is widely used in engineering. Set the position of the late poured band, the distance calculation is determined by design, its width considering convenient construction, avoid the stress concentration is 800 ~ 1200mm; the waterproof requirements of the parts of the pouring belt, belt sealing should be considered. Effect 1. solve the differential settlement The design of the structure and foundation of high-rise building and the podium of the whole, but in the construction of the two part with the post pouring belt temporarily disconnected to the main structure of the construction is completed, has completed most of the settlement (more than 50%) after the connection part of the concrete pouring, the level as a whole. The design of foundation should be considered in two stages of different stress state respectively, load check. Even after the additional internal force calculation of overall consideration should

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档