4. 工程量清单报价表(4. bill of quantities quotation).docVIP

4. 工程量清单报价表(4. bill of quantities quotation).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
4. 工程量清单报价表(4. bill of quantities quotation) 4. bill of quantities quotation Project Name: Fujian province state-run ancient agricultural farm Fang reservoir reinforcement project unit: Yuan number Name of project or cost Company Engineering quantity Unit Price Valence Remarks One Part 1 construction works (I) Dam anti-seepage reinforcement One Thickness of cutoff wall for vibration sinking mould 150mm M2 Two thousand two hundred and twenty Two D500 single tube high pressure jet drilling (formation type, clay, sand) M Eight thousand four hundred and ninety-six point three seven Three D500 single tube high pressure jet grouting M Three thousand two hundred and sixty-one point three seven (two) Reinforcement of dam thickness One Clay tamping: artificial filling earth dam (dyke) M3 Six thousand three hundred and twenty-four point eight Two Artificial leveling ground type III soil M2 Two thousand six hundred and ninety-two point eight Three Artificial excavation III soil M3 Three hundred and seventy-eight point four Four Slurry block drain M3 Forty-eight point nine Five Drainage ditch, prism, dry block stone, revetment plane M3 Two hundred and twenty-three (three) Spillway regulation One Artificial excavation: artificial digging and loading (lift) pick the earth, the distance within 20M class III soil M3 Six hundred and forty-six point seven Two M10 slurry block retaining wall M3 Seventy-seven point four (four) observation system One Observation pier: Precast concrete small components and installation M3 Twenty-two Two Observation tube M Two hundred and fifty Three Reinforcement fabrication and installation T Zero point eight six Four Measuring weir place Three 4-1 Artificial digging trench upper width less than 1m depth is less than or equal to 1m class III soil M3 Seventeen point two one 4-2 Masonry stone block, Shiqu bottom, width, 1M M3 Six point six nine 4-3 Masonry mortar precausions average 2 cm thick plane M2 Eight point nine three 4-4 Embedded iron piece instal

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档