- 1、本文档共26页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
7. To ensure that the appropriate commissioning procedures are employed, the commissioning specialist should carefully review the recommendations of the equipment suppliers. 8. VAV systems typically comprise the following components, some of which may require specialist commissioning by the manufacturer in addition to general commissioning as part of a complete air distribution system 9. A particular check should be made to ensure that distribution ductwork internals are clean throughout. If there is any doubt regarding the state of system cleanliness, the commissioning specialist should formally draw attention to this. review: 查阅 复习 equipment suppliers: 设备提供商 how to translate??? internal: 内部 draw attention to…: 对…注意 10. With the supply and extract fans operating simultaneously, the running speed should be increased gradually. Motor running current checks should be made at various increments, and the results recorded for each fan, to assess performance and prevent overloading of the motor. 11. The fans should then be stopped and made safe so that the cause of the static pressure irregularity can be investigated and rectified by the appropriate personnel before proceeding further. 12. during the commissioning of the individual VAV terminals, it may be necessary to further fine-tune the fan speed to compensate for any system pressure variations. current: 电流 increment: 增量 overloading: 过载 irregularity: 无规律(的变化) rectify: 修正 调整 personnel: 人员 proceed: 继续进行 terminal: 终端 终点 terminal station fine-tune: 微调 13. All procedures and techniques to be applied in checking terminal unit volume flow rates should be in accordance with the manufacturer’s instructions and should be incorporated into the commissioning method statement. 14. Verification of these arrangements is necessary, and the number of VAV terminal units to be checked should be defined within the project commissioning specification.
您可能关注的文档
最近下载
- 2025河北秦皇岛市海港区招聘中小学教师371人笔试参考题库附答案解析.docx VIP
- 《项目管理基础教程》课件.ppt VIP
- 青霉素过敏试验及过敏反应的预防(共35张PPT).pptx VIP
- 第一章 运动的描述【速记清单】(解析版)-2024-2025学年高一物理单元速记·巧练(人教版2019必修第一册).docx VIP
- 第二章 匀变速直线运动的研究【速记清单】(解析版)-2024-2025学年高一物理单元速记·巧练(人教版2019必修第一册).docx VIP
- 农行某市支行各岗位廉政风险点及防控措施一览表(最新最全面版本) .pdf VIP
- Positioning课件.ppt VIP
- 建行某市支行各岗位廉政风险点及防控措施一览表(最全最新版本) .pdf VIP
- 徕卡TS30全站仪简易操作说明.pdf VIP
- 川渝地区矿山生态修复技术规范 第二部分 建材矿山.pdf VIP
文档评论(0)