Deokjae CONSTRUCTION COMPANY LTD (Deokjae建设有限公司).doc

Deokjae CONSTRUCTION COMPANY LTD (Deokjae建设有限公司).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Deokjae CONSTRUCTION COMPANY LTD (Deokjae建设有限公司)

Environmental Impact Assessment of reconstruction of berth 15-17A including SRB’s-1 2 on East Wharves at Karachi Port Final Report May 2010 Marine Pollution Control Department Karachi Port Trust Karachi Executive Summary The Karachi Port Trust (KPT) has planned to undertake the reconstruction of berths 15-17A and Ship Repair Berth’s (SBR’s) on East Wharves at the port of Karachi. The project aims to provide optimum marine terminal facilities for cargo handling, forecasted import and export cargo for the next thirty years for the Karachi Port and replacement of non-operational berths 15-17A and SRB’s 1 2. The project, on completion, will provide 922 m of modern, efficient and high throughput multipurpose cargo handling berths, capable of accommodating bulk vessels of 100,000 DWT with a draft of 15.5 m, container vessels of 13.5 m draft and Ro-ro Car carriers, which will be visiting the port in forecast future. The project will eliminate otherwise waiting time for ships and yield savings in marine transport costs. The KPT considered three alternatives for the project i.e., relocation of the berths to idle part of the harbour, an increase in the handling capacity of other operational berths to compensate for the loss due to unavailability of these berths, and deepening of harbour channel for accommodating more ships at the existing berths. However, these alternatives were not feasible due to a number of reasons as elaborated in the report and reconstructions of existing berths were found to be technically, environmentally and economically best option. At the East Wharves, berths 1-9 are operational, 10-14 are under construction, 15-17 A and SRB’s 1 2 are non-operational as these are old and in dangerous condition which are to be reconstructed under the project. The reconstruction of berths 15-17A and SRB 1 2 on East Wharves at Karachi Port project includes the following: Construction of approximately 922 m of continuous 2 m diameter concrete piled quay wall

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档