- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Disaster Preparedness and Response Plan (灾难防备和应对计划)
Disaster Preparedness and Response Plan Development Guide
Prepared for the Architectural Heritage Center by Scott Reuter
This publication was supported with assistance from the Oregon Heritage Commission, Oregon Parks and Recreation Department. Points of view are those of the author and do not necessarily represent those of the State of Oregon
Disaster Preparedness and Response Plan Development Guide
Phase I: Organizing Resources and Team Building
Phase II: Assessing Risks
Phase III: Mitigation Plan Development
Phase IV: DPRP Implementation
Phase V: DPRP Ongoing Improvements
The DPRP Development Narrative in 5 Phases:
Phase I - Organizing Resources and Team Building:
New DPRP group/team fills out team – building questionnaires about themselves, the?facility, collection and staff/volunteer preparedness. The first 3 sections or phases of this
guide are a DPRP Plan development?template with all appropriate questionnaire assessment documents to?complete. These are used in Phase I, II and III to assemble all necessary?? information for assessment and begin mitigation work.
We’re filling out the team- building and assessment forms to see what we need.
Phase II - Assessing Risks:
Team uses Phase I team building questionnaires and information to begin the mitigation and response plans. During this phase, the DPRP team will fill out assessment questionnaires and use the information learned to begin creating a mitigation plan, or a prioritized mitigation to-do list; this?list will include organizational tasks, information gathering tasks, and materials and equipment inventory tasks.
We’re using the info from Phase I and II to create a master to-do list for Phase III
Phase III - Mitigation and Response Plan Development: Use information on mitigation and response plan priorities to assign team tasks and responsibilities, acquire disaster supplies and equipment, and begin staff and?volunteer training.
We’re addressing the needs by following the to do list from Phase II. As
您可能关注的文档
- DESIGN AND CONSTRUCTION OF MAIN (设计和施工的主要).pdf
- Design and Construction of RollerCompacted(设计和施工碾压).pdf
- DESIGN AND CONSTRUCTION OF SEEPAGE CUT (设计和施工的渗流削减).pdf
- Design and Control of a Lower Limb Exoskeleton (下肢外骨骼的设计和控制).pdf
- Design and Benefits of Dynamic Skip Fire (设计和动态跳火的好处).pdf
- DESIGN AND DEVELOPMENT COPPER ROTOR (设计和开发铜转子).pdf
- Design and Development of Electrical Car IJETAE(设计和开发的电动汽车IJETAE).pdf
- Design and Evaluation of a Networked Team (设计和评价一个网络团队).pdf
- Design and Fabrication of Automatic Balancing (设计和制造的自动平衡).pdf
- Design and Engineering Documentation Using (设计和工程文档使用).pdf
- Dimension Guidelines Ohio University(维指南俄亥俄大学).pptx
- Discovering Advanced Algebra Denver Public (发现高等代数丹佛公共).doc
- Dividing with Unit Fractions Homestead(划分单元分数家园).doc
- Doing Business in Saudi Arabia Latham (在沙特阿拉伯做生意Latham &).pdf
- Doc No Directorate of Standardisation(医生没有标准化的理事会).doc
- DOUBLE CONTAINMENT DESIGN (双密封设计&).pdf
- Document2 Vibration Isolation Platform (Document2 隔振平台&).pdf
- DIGOXIN Lippincott Williams Wilkins(地高辛威廉姆斯Lippincott &威尔金斯).pdf
- Draft Minutes Office of Science(草案分钟科学的办公室).docx
- Each of the 34 CobiT Control Objectives, or IT (每个CobiT控制目标,或者).doc
最近下载
- 第3课+追求人生理想+第一框+第3目【中职专用】2024-2025学年中职思想政治《哲学与人生》(高教版2023基础模块).pptx VIP
- 2011年考研英语二真题及答案解析.pdf VIP
- 《建筑施工企业碳排放统计核算标准》.pdf
- 面向教学评价的情感分类.pptx VIP
- 人教A版必修第一册高中数学2.1等式性质与不等式性质【教学课件】.pptx VIP
- 《中药材炮制加工方法图解》.pdf VIP
- 小学残疾儿童送教上门教案(40篇).pdf VIP
- 羊群效应——一个班级最可怕的存在!--高一上学期班级凝聚力主题班会课件.pptx VIP
- Apple 环保系统操作说明FMD_Portal_TRM_Training.pdf
- 厄瓜多尔介绍PPT.pptx
文档评论(0)