- 1、本文档共51页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Chapter 8 Constructing a Decision Support System and DSS Research课件
Chapter 8 Constructing a Decision Support System and DSS Research;8.1 Opening Vignette: Hospital Healthcare Services Uses DSS;1992 various DSS applications in
Productivity
Cost accounting
Patient mix
Nurse staff scheduling
Several different mainframe and PC software packages
Early 1992, integrated mainframe-based DSS development tool MAPS
Modeling
Forecasting
Planning
Communications
Database management systems
Graphics
Productivity DSS in MAPS
Faster and easy to interpret;8.2 Introduction;DSS Construction is Complicated ;Decision Support Systems and Intelligent Systems, Efraim Turban and Jay E. Aronson
Copyright 1998, Prentice Hall, Upper Saddle River, NJ;Decision Support Systems and Intelligent Systems, Efraim Turban and Jay E. Aronson
Copyright 1998, Prentice Hall, Upper Saddle River, NJ;8.3 Development Strategies ;8.4 The DSS Development Process;Phase A: Planning
Need assessment and problem diagnosis
Define objectives and goals of the DSS
What are the key decisions?
Phase B: Research
Identification of a relevant approach for addressing user needs and available resources;Phase C: System Analysis and Conceptual Design
Determination of the best construction approach and specific resources required to implement
Includes
Technical resources
Staff resources
Financial resources
Organizational resources
Conceptual design followed by a feasibility study;Phase D: Design
Determine detailed specifications of system
Components
Structure
Features
Select appropriate software or write them
Phase E: Construction
Technical implementation of the design
Tested and improve continuously
Interface DSS with other systems;Phase F: Implementation
Testing
Evaluating
Demonstration
Orientation
Training
Deployment
Phase G: Maintenance and Documentation
Planning for ongoing system and user support
Develop proper documentation
Phase H: Adaptation
Recycle through the earlier steps;8.5 The Development Process: Life Cycle versus Prototyping ;The System Development Life Cycle (SDLC) A
您可能关注的文档
- ch03The Balance Sheet and the Statement of Changes in Stockholders’Equity(中级会计学-赖红宁)课件.ppt
- ch01 What is Software Engineering?课件.ppt
- Ch-3-Pharmacody-课件.ppt
- ch01_lecture课件.ppt
- Ch02 Collaborative Mechanism of SCM System课件.ppt
- Ch04Utility(微观-范里安-(上海交通大学,赵旭 )课件.ppt
- Ch03制造工艺课件.ppt
- ch04 Linked Stacks and Queues课件.ppt
- Ch04 TREES(数据结构外文版)课件.ppt
- Ch07 Conversion课件.ppt
文档评论(0)