001人工挖土施工工艺(The construction technology of artificial excavation).doc

001人工挖土施工工艺(The construction technology of artificial excavation).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
001人工挖土施工工艺(The construction technology of artificial excavation)

001人工挖土施工工艺(The construction technology of artificial excavation) The artificial digging 1 around This technological standard is applicable to the excavation of the foundation pit (groove) and pipe ditch of general industrial and civil buildings, structures and structures. 2 construction preparation 2.1 main tools: sharp, flat head spade, hand hammer, trolley, ladder, iron pick, crowbar, steel ruler, slope ruler, small line or 20 lead wire, etc. 2.2 operating conditions: 2.2.1 before excavating the earth, the earth shall be able to clear the underground pipeline and other obstructions, and remove and dispose of the ground and underground obstacles in the construction area according to the requirements of the construction plan. 2.2.2 positioning control line (pile) of buildings or structures, standard level piles and grey line size of the base tank must be inspected and checked and checked in. 2.2.3 the surface of the site shall be cleaned and smoothed, and the drainage slope shall be completed. In the construction area, temporary drainage ditch shall be dug. 2.2.4 during night construction, the working procedure should be reasonably arranged to prevent the wrong digging or digging. The construction site should be installed according to the need to install lighting facilities, in dangerous lot should set clear signs. 2.2.5 excavation pit (tank), pipe trench below the underground water level, should according to the local engineering geological data, take measures to reduce the underground water level, typically have fallen to below excavation bottom, 50 cm, and then the excavation. 2.2.6 be familiar with the drawings and make the bottom of the technology. 3 operation process 3.1 technological process: Determine the order and slope of excavation - Cut the contour line along the gray line - Stratified excavation - Trim trough - The bottom of the qing dynasty 3.2 determination of slope: 3.2.1 in the soil of natural humidity, excavate foundation pit (groove) and trench,

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档