兰大《土木工程施工》13春在线作业4(Landa civil engineering construction 13 spring online homework 4).doc

兰大《土木工程施工》13春在线作业4(Landa civil engineering construction 13 spring online homework 4).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
兰大《土木工程施工》13春在线作业4(Landa civil engineering construction 13 spring online homework 4)

兰大《土木工程施工》13春在线作业4(Landa civil engineering construction 13 spring online homework 4) Spring 13, autumn, civil engineering construction 13 spring online homework 4 Total score: 100 test time: -- Single topic selection Multiple choice True or false (a total of 15 questions, 30 minutes.) 1. The design of the unit construction organization to reduce cost measures shall be the scale A. Investment estimation B. design estimates C. Design budget D. construction budget Full mark: 2 2. There are both outgoing arrow lines and inward arrow line segments in the double codename network () A. starting node End node C. Intermediate node D. Any node Full mark: 2 3. In accelerating the multiplication of the multiplication, the spacing of the running water between any two adjacent professional teams is equal to that of the flow meter () The maximum value of A. B. the minimum C. Maximum common divisor D. Minimum common divisor Full mark: 2 4. The exterior plaster of the building should be selected () A. hemp fiber grey B. paper reinforced ash C. The answer of the mixed sand is not uploaded. Please review and use it for review. If you need an answer, please check my registration name to find the slurry D. cement mortar Full mark: 2 5. When the clay brick masonry masonry is to be staggered, the length of the knot should be () A. 120 mm B. 80 mm C. 60 mm D. 100 mm Full mark: 2 6. The tensile stress caused by the stress wave of reflection is often caused by stress wave of the pile top A. A third B. two thirds C. a quarter D. 1/2 Full mark: 2 7. Even the wall parts should be set horizontally. When the horizontal setting cannot be set, the upper part of the connecting end of the scaffold can be connected with the lower Angle, and the lower Angle shall not exceed (), and the upper oblique connection shall not be used A. ten degrees B. 15 degrees 20 degrees c. D. 25 degrees Full mark: 2 8. The construction joints of underground waterproof concrete shall remain in the wall, and should not be l

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档