- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
冬季施工四大标准(The four standard of winter construction)
冬季施工四大标准(The four standard of winter construction)
The four standard of winter construction
A, the environmental standards of winter construction: 1, keep indoor temperature in more than 15 ℃, the temperature below 15 ℃, should stop wearing liner or water resistant putty scraping wall construction; Less than 5 ℃, should stop to cement mortar leveling plaster, the floor tile of wall of brick construction; Below 8 ℃, stop the paint coating construction. 2. Indoor humidity should be kept at 25-40%, and under 25%, artificially increase the humidity by placing a water basin or bucket. Humidity above 40% should be enhanced ventilation. 3, indoor ventilation requirements, on the premise of assure indoor temperature to natural ventilation, but must avoid strong air convection, using central air conditioning heating construction site, should strengthen the air circulation. Avoid ventilation before the woodwork is painted. 4. When painting and painting, should strengthen ventilation, avoid harmful gas accumulation, and pay attention to external discharge. 5, dust control, in the construction process is easy to produce dust, should strengthen the air humidity, increase cleaning frequency, reduce the dust accumulation, for the paint when construction to avoid metope grinding dust such as homework at the same time. 2. The materials for the construction of winter construction shall be protected by the standard 1, wood and board, and shall be kept out of the heat source of 800mm to avoid the cracking and deformation of wood and plates caused by overheating. 2. The room with geothermal heating shall be used to add wood to the bottom of the board and to avoid the cracking and deformation of wood. 3. Each pair of decorative panels is a pair of panels, face to face, face to face, and the pressure is mounted on the upper surface to ensure that the decorative panel is not curly, not deformed, and not cracked. 4. Waterborne coatings and glue should be stored in a room with high temperatu
您可能关注的文档
- (MTT498—1995) CKJ系列交流真空接触器维修检验技术规范((MTT498-1995) CKJ series ac vacuum contactor maintenance test technical specification).doc
- (上海财大)公共经济与管理学院及相关专业简介((Shanghai finance and economics) public school of economics and management and related majors).doc
- (文科20题)已知抛物线 ,圆(We have a parabola, a circle).doc
- (蕨菜)茶((bracken) tea).doc
- 001人工挖土施工工艺(The construction technology of artificial excavation).doc
- 013福师《管理学概论》在线作业二(第5次)(013 fu shi introduction to management online homework 2 (5th)).doc
- 04.行车闭塞07-04-01(04. The traffic is closed at 07-04-01).doc
- 040430太阳风暴-何香涛(040430 solar storm - ho xiangtao).doc
- 05试卷(05 papers).doc
- 04可摘要点(04 abstract points).doc
文档评论(0)