专用电抗器保护装置(Special reactor protection device).doc

专用电抗器保护装置(Special reactor protection device).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
专用电抗器保护装置(Special reactor protection device)

专用电抗器保护装置(Special reactor protection device) Special reactor protection device The electric railway traction substation is equipped with parallel capacitor compensation device, which is mainly used to compensate the reactive power, reduce the negative sequence current and control the harmonics. In general, in order to reduce the flow ratio and flow frequency capacitor group, makes the loop device is easy to choose, and at the same time to three effective filtering of harmonic function, 12% capacitive reactance value of reactor in series with loop, the whole system work in the state of three harmonic overcorrection. Original series reactor are mostly adopt oil-immersed, because of the influence of the operation of maintenance workload big, has gradually been heat-resistant properties can be good, loss of lower dry type reactor is replaced, such as electrified railway all adopt jing zheng CKBT type parallel cylinder structure of dry type reactor. Although there are many advantages to this dry type reactor compared with oil immersion, there are some problems in operation, which are mainly manifested in: Burns during impact test Before the electric railway is opened, the impact test of the towing transformer is carried out. Jing zheng line when sending the reactor burning accident happened more than 30% of the substation, Beijing - anyang paragraph alone in Joan pave, coloured glaze river, xingtai substation in the burn out 1, LiuXinZhuang substation burned two reactor, direct economic loss of more than million. The running of the fire There are many reports of parallel capacitance compensator in traction substation in BLQ unmoved, control room without any warning, and after maintenance. In 2003, the B phase reactor of the transformer substation of the power station in handan was on fire, and the liuxinzhuang substation of liuxinzhuang in shijiazhuang, in 2007, was found to be on fire after the operation. Lack of necessary protection In the existing design, the traction

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档