- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
脱硫装置就地电气设备安装(Installation of local electric equipment in desulfurization unit)
脱硫装置就地电气设备安装(Installation of local electric equipment in desulfurization unit)
This article is contributed by shylock125
Pdf documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Data of completion of project of installation of electric equipment in desulfurization unit
Local electrical equipment installation division engineering quality acceptance assessment sheet
Project number: 18-3, serial number 3434, sub project name, nature evaluation results, table number: DL/T 5161.1, table 4.0.2 remarks
MCC (motor control) installation disk, MCC disk to install the base cabinet (motor control) disk to install low-voltage circuit breakers, contactors and motor starters to check the installation of low-voltage busbar installation in the installation of electrical equipment in local control equipment installation control limit switch button and the low-pressure switch check motor installation check two times loop check wiring installation cabinet base
Acceptance conclusion:
Quality inspection organization site
Quality acceptance assessment opinion
sign
Year, year, month, month, day, day
Thirty-four
Quality inspection supervisor
Construction unit
Data of completion of project of installation of electric equipment in desulfurization unit
Tray and cabinet foundation installation
Project number: 18-3-1.1 process inspection items, length per meter, length per meter, the main properties of units mm, mm, mm, mm, mm
Quality inspection and evaluation sheet of sub item
Table number: DL/T, 5161.8, table 1.0.2 quality standard, quality test result, individual evaluation
Foundation steel
Allowable error
Foundation steel installation
Degree of straightness
1 5 1 5 5 2 solid, good conduction
Location error and unevenness installation foundation grounding number earthing connection
spot
Acceptance conclusion:
Quality inspection organization
Quality inspection and evaluation opinion
Y
您可能关注的文档
- 地质分层(The geological stratification).doc
- 地质工程专业(水文地质工程地质方向)培养方案(Geological engineering (hydrogeological engineering geology) training scheme).doc
- 地理知识要点(geography).doc
- 地大《建筑结构抗震设计原理》在线作业一(The principle of seismic design of architectural structures is one).doc
- 地铁施工工法汇总(Summary of subway construction work method).doc
- 地铁对地质的影响1(Subway affects geology 1).doc
- 地震液化(Earthquake liquefaction).doc
- 地方图集(The local atlas).doc
- 地震自救(The earthquake itself).doc
- 场景布置(Scene arrangement).doc
- 脸上斑点全功破(The face is full of spots).doc
- 脸上有斑吃什么好(What's on your face).doc
- 脸上斑点全攻破(The face is full of spots).doc
- 脸上漂亮与内脏有关(The beauty of the face is related to the gut).doc
- 脸上长痘部位以及对应的身体问题(Pox on the face and the corresponding physical problems).doc
- 脸与内脏的关系(The relationship between the face and the viscera).doc
- 脸与内脏(Face and gut).doc
- 脉冲清灰袋式除尘器的使用与维护(Application and maintenance of pulse cleaning bag filter).doc
- 脸上长斑的原因(The reason of long spot on the face).doc
- 脸型与性格(Face and personality).doc
文档评论(0)