- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地铁对地质的影响1(Subway affects geology 1)
地铁对地质的影响1(Subway affects geology 1)
Although the geological conditions in guangzhou are very complicated, the construction of metro has been developed for a more mature experience. (information picture)
The vice President of guangzhou metro corporation received an exclusive interview with this newspaper to solve the geological problems
The topic is the new express reporter zhang yingzi
The special issue of the new express reporter xu jing
Guangzhou geology is so complicated, how will the subway network that is being built on a large scale be affected? Is subway construction and safety unsafe? , deputy general manager of guangzhou metro corporation shao-zhang Chen with the financial times in an interview that: guangzhou is not suitable for to build the subway has long been a worry, 1962 in guangzhou first geological exploration report is the conclusion, geology is not suitable for building the subway in guangzhou. But he also said that guangzhou metro has developed a more mature experience and countermeasures in more than a decade, and citizens need not worry.
history
The geological problem delayed the birth of the subway
Chen told reporters that from the planning process of guangzhous urban rail transit network, in 1962, the first geological exploration report was made in guangzhou. It has also been pointed out that the geological conditions of guangzhou are characterized by the fluctuation of the topography and the complex and diverse strata lithology. There are three major geological problems in guangzhou: first, there are many faults in guangzhou, and there are more than ten faults in the subway line. The biggest problem of the fault zone is that the rock mass is broken, and the surrounding intact bedrock belongs to the weak layer, which can cause the accidents of water surge and water burst during construction of the tunnel. The second is the granite, mixed granite residual layer. When immersed in water, the soil layer will quickly soften and disintegrate and fl
您可能关注的文档
- 1相关专业知识-护理管理1(1. Related professional knowledge - nursing management 1).doc
- 1998-01-13中国民用航空快递业管理规定29640(1998-01-13 China civil aviation express industry regulation 29640).doc
- 1酒水分类(1 beverage classification).doc
- 2 字符替换与移位(2 character replacement and shift).doc
- 2.14.3 钢梁现场安装安全技术交底(2.14.3 the installation of safety technology at the site of steel beam).doc
- Net中通用的FormatString格式符整理(In.net, the FormatString format is used for formatting).doc
- 2.手机充电器型号通用对照表(2. Mobile phone charger model general comparison table).doc
- 2.14单刷奔放版使用说明(2.14 single-brush use instructions).doc
- SummerNETEM阅读理解17(SummerNETEM reading comprehension 17).doc
- zonghebuxian(zonghebuxian).doc
- 地震液化(Earthquake liquefaction).doc
- 地方图集(The local atlas).doc
- 地震自救(The earthquake itself).doc
- 场景布置(Scene arrangement).doc
- 均衡器概念&foobar设置(Equalizer concept & foobar setting).doc
- 坡道式汽车库(Ramps garage).doc
- 垃圾站标准(Refuse station standard).doc
- 垃圾分类(Garbage classification).doc
- 城关中学学科作业设计(The design of the discipline work of chengguan middle school).doc
- 城乡一体化与区域协调发展一(上)答案(Urban and rural integration and regional coordinated development one (top) answer).doc
文档评论(0)