- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
装饰装修-吊顶工程(Decoration - ceiling works)
装饰装修-吊顶工程(Decoration - ceiling works)
Seal sample after confirmation.
Approach II supplier or the construction unit materials must be submitted at the same time, the factory quality certificate and test report of formal verification approval to import materials supervision, commodity inspection departments must provide inspection report, and submit a photocopy of the supervision.
The sampling process of 3 materials and products after entering and materials, construction, construction and supervision must be made by the three party (or the construction and supervision of two parties) jointly staging batches, specifications of sampling, send out according to the test report with the qualification certificate of inspection unit * test, test report timely to the supervisory approval after verification the archive, the test after the products and materials and parts * to use, materials and products and processing of unqualified shall not be used for the project, and shall not be deposited in the field, must be evacuated in the supervision notification period, unilateral sampling is invalid, if there is doubt, the supervisor can random sampling.
The sampling period is long for materials, products or parts, suppliers or construction units must advance 7 to 15 days after passing to the daily supervision and sampling, supervision verification can be set before use, unilateral sampling is invalid.
1. gypsum board ceiling
The location of the ceiling line is accurate, the standard deviation is 5mm, the check is qualified, the form is signed and signed, and the supervision is checked and accepted. After the approval of the supervision and acceptance, it can enter the next process construction.
Whether the number and location of the decorative ceiling hanger unit self check to meet the requirements of design or specification, and brush two times anti rust paint, self qualified daily supervision and acceptance, supervision acceptance after the signing, in order to enter the next p
您可能关注的文档
- 生产件批准程序(Production parts approval process).doc
- 生产完全服务消费型经济控制模型(A consumption control model of full service consumption).doc
- 生产性服务业发展与人才培养的要求(The development of productive service industry and the requirement of talent training).doc
- 生产环境下的服务器的crontab写法(Production environment server crontab writing).doc
- 生产计划与控制(Production planning and control).doc
- 生化审报小常识(Biochemical test report common sense).doc
- 理论考技巧(Theory test technique).doc
- 生命探测仪(Life detector).doc
- 生命的价值在于奉献--理论--人民网(The value of life lies in devotion -- Theory -- people's Web).doc
- 生命禅院理念序言(Life temple, idea, preface).doc
- 血栓病因(Thrombosis etiology).doc
- 装修要注意的几点(Decoration should pay attention to a few points).doc
- 血站发血工作计划(The blood bank blood work plan).doc
- 西交《材料力学》在线作业(Western materials mechanics online homework).doc
- 西交《物理化学(高起专)》在线作业(West turn physics chemistry (high school) online homework).doc
- 西交《生物药剂与药动学》在线作业(Online operation of biological medicine and pharmacokinetics).doc
- 西医内科重点(Key points of Western Medicine).doc
- 西安住房公积金新政解读(New interpretation of Xi'an housing accumulation fund).doc
- 装修遗憾大全(Sorry for the decoration).doc
- 装修中必买的材料(Decoration will buy material).doc
文档评论(0)