土方开挖施工方案(Earthwork excavation construction plan).docVIP

土方开挖施工方案(Earthwork excavation construction plan).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方开挖施工方案(Earthwork excavation construction plan)

土方开挖施工方案(Earthwork excavation construction plan) Earthwork excavation construction plan 1 、 construction preparation Measure the line and measure the protection of the pile point (1) before the excavation of the foundation pit, all the red line piles and the dowel of the building are located. If the displacement of the positioning pile is definite, if there is a shift, the planning department and construction unit should be studied and dealt with and corrected. (2) locate the temporary facilities on the side roads and temporary facilities for observation. (3) before the excavation of foundation pit excavation, to survey on the mouth of the lime line according to the pile axis and the sloping excavation, foundation pit construction drawings approved. (4) before the excavation of the foundation pit, all the axis piles and the standard points in the excavation of the foundation pit should be taken out of the construction activity area, and the nails will be nailed and protected after the pile is deep. (5) once all the stakes and red lines have been verified, the project department shall carry out regular inspection and review to ensure the accuracy of the red line. 2. Preparation of lighting during night construction During the excavation of the pit, the electricity is illuminated during the night: A, all power consumption can be carried from the field distribution box, through the mobile distribution box to the earthwork excavation area. B, night lighting construction within the scope of the activities of each lamp holder, lamp holder mounting 1000W lamp. C, on the spot, put the slope position, depending on the situation, place a certain number of lights. 3 、 foundation pit excavation method It adopts mechanical excavation and artificial cleaning method. (1) slope excavation; According to the geological survey data and on-site observation, the foundation works better soil quality. According to construction specifications, mechanical excavation according to the design

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档