土建工程量计算1---平整场地 大开挖土方 满堂基础垫(Calculation of civil engineering quantity 1--- leveling site, large excavation, earthwork, foundation pad).docVIP

土建工程量计算1---平整场地 大开挖土方 满堂基础垫(Calculation of civil engineering quantity 1--- leveling site, large excavation, earthwork, foundation pad).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土建工程量计算1---平整场地 大开挖土方 满堂基础垫(Calculation of civil engineering quantity 1--- leveling site, large excavation, earthwork, foundation pad)

土建工程量计算1---平整场地 大开挖土方 满堂基础垫(Calculation of civil engineering quantity 1--- leveling site, large excavation, earthwork, foundation pad) Calculation of civil engineering quantity: 1--- leveling site, large excavation, earthwork, foundation pad Leveling site: excavation, filling, transportation and leveling of buildings with a thickness of less than 30cm 1. Calculation rules of leveling site (1) list rules: according to the design drawing size, the first floor area of the building is calculated. (2) quota rules: according to the design drawing size, the first floor area of the building is calculated. 2. Calculation method of leveling site (1) the leveling area of the list rule: the flat area of the list rule = the floor area of the first floor (2) the leveling area of the quota rules: the level of the quota rules, the floor area = the floor area of the first floor 3, matters needing attention (1) in some areas, quota rules leveling area: the exterior line put 2 meter. Calculation, according to the outer wall outside the line of 2 meters of graphics block calculation, and then with the bottom floor area combined calculation; or according to put 2 meters outside the center line * 2= outside 2 meters area, and the bottom floor area combined calculation. In this case, the following difficulties arise in the calculation: It is troublesome to divide blocks, the arc part is not easy to handle, and the error is easy to occur. 2. The central line of 2 meters is more troublesome and difficult to calculate. Large excavation raft foundation pad style= WIDTH: 621px HEIGHT: 171px height=171 alt=; civil engineering calculation 1--- flat ground excavation earthwork raft foundation pad src= /bmiddle/4cc82c0f06eaac506e041 width=603 real_src= /bmiddle/4cc82c0f06eaac506e041 After 2 meters outside, there may be overlapping parts. How many bad calculations should be deducted? Large excavation raft foundation pad style= WIDTH: 608px HEIGHT: 215px height=215 alt=; civil engineering calculati

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档