施工现场临时用电安全检查内容(Temporary power safety inspection contents on construction site).doc

施工现场临时用电安全检查内容(Temporary power safety inspection contents on construction site).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工现场临时用电安全检查内容(Temporary power safety inspection contents on construction site)

施工现场临时用电安全检查内容(Temporary power safety inspection contents on construction site) Temporary power safety inspection contents on construction site 1. earthing and earthing protection system 1) construction site temporary power must conform to the current industry standard construction site temporary electrical safety technical specifications (JGJ46-2005), using transformer neutral grounding, the zero line and the zero line protection work must be separately, shall not be mixed; 2) has a dedicated transformer at the construction site, the neutral point of power supply the line directly grounded, must adopt the three-phase five wire grounding protection system; 3) repeat grounding effect can not be ignored, repeat grounding resistance should be less than R and less than or equal to 10 ohms, working grounding resistance should be less than R less than 4 ohm; 4) protective zero line dry line at least three repeat grounding the starting end: (distribution room or general distribution box office), and at the end of the middle line; 5) unified logo protective zero line is green / yellow color line, no case; 6) into a three-phase four wire three-phase five line to the right, in the general case or distribution Room, ground bus and zero connection bus must be short circuited; 7) with a power supply system shall be a part of the equipment to do the protective zero line, the other part of the equipment for the protection of ground; 8) the construction site of the temporary electricity must implement the three level distribution, which set the total distribution box, distribution box and switch box. 2. distribution box and switch box 1) equipment switch box should be installed leakage protection switch, electric power and lighting distribution box should be set separately; 2) distribution box of inlet and outlet position should be located at the bottom of the box under, is strictly prohibited arranged at top, side, or rear box door; 3) distribution box bottom: a fixed distance fro

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档